Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction A factor analysis approach

被引:10
|
作者
Chan, Joseph [1 ]
Chan, Daniel [1 ]
Chan, Albert [2 ]
Lam, Patrick [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Fac Construct & Environm, Hong Kong, Peoples R China
关键词
Hong Kong; Construction industry; Contracts; Costs; Guaranteed maximum price contracts (GMP); Target cost contracts (TCC); Risk mitigation strategies; Factor analysis;
D O I
10.1108/14725961211200379
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - There is a lack of empirical research on risk mitigation strategies for those construction projects procured by guaranteed maximum price contracts (GMP) and target cost contracts (TCC). The paper aims to identify and analyse the risk mitigation strategies for GMP/TCC construction projects from the Hong Kong perspective. Design/methodology/approach - A total of 94 industrial practitioners with both sound knowledge and abundant hands-on experience of the GMP/TCC methodology participated in an industry-wide empirical questionnaire survey to indicate their levels of agreement on those 18 risk mitigation strategies identified from reported literature and in-depth interviews which were later analysed by factor analysis. Findings - The results of factor analysis revealed that the 18 individual risk mitigation strategies can be consolidated into seven underlying grouped factors: relational contracting and mutual trust; clear contract provisions and well-defined scope of works; involvement of contractor in decision making process; right selection of project team; third party review of project design at tender stage; standard contract clauses for GMP/TCC schemes; and fair treatment of contractor. Research limitations/implications - Although both GMP/TCC contracts have been increasingly popular in the construction market of Hong Kong, not all of these projects have been equally successful and some of them have been exposed to very high risks or uneven allocation of risks. A detailed analysis and an implementation of recommended effective risk mitigation strategies are essential to the success of GMP/TCC schemes. Originality/value - The research findings of this study are expected to help the decision makers to generate useful insights into risk mitigation strategies when administering GMP/TCC contracts at an early stage of project delivery and lay a solid foundation for further research on GMP/TCC in both local and international contexts.
引用
收藏
页码:6 / +
页数:21
相关论文
共 11 条
  • [1] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Yeung, John
    JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) : 34 - +
  • [2] A CRITICAL STUDY OF RISK ALLOCATION IN GUARANTEED MAXIMUM PRICE AND TARGET COST CONTRACTS IN HONG KONG
    Chan, Joseph H. L.
    Chan, Daniel W. M.
    Lam, Patrick T. I.
    PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 205 - 215
  • [3] Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 495 - 507
  • [4] An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (05) : 577 - 590
  • [5] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [6] Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Yeung, John F. Y.
    Chan, Joseph H. L.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) : 751 - 763
  • [7] Preferred risk allocation in target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Lam, Patrick
    Chan, Albert
    FACILITIES, 2011, 29 (13-14) : 542 - +
  • [8] Integrated Approach to Risk Analysis and Mitigation in Polish Construction Industry Capital Groups
    Teneta-Skwiercz, Dorota
    EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT: A 2025 VISION TO SUSTAIN ECONOMIC DEVELOPMENT DURING GLOBAL CHALLENGES, 2020, : 13182 - 13190
  • [9] Impact of risk mitigation strategies on non-fatal injuries in the construction sector in qatar: a retrospective analysis
    Soubra, Lama
    Al-Mohannadi, Alreem
    Berzan, Yasser
    Consunji, Rafael
    El-Menyar, Ayman
    Al-Thani, Hassan
    Al-Marri, Mohammed Ali
    Al-Hajri, Hamad Saed
    INTERNATIONAL ARCHIVES OF OCCUPATIONAL AND ENVIRONMENTAL HEALTH, 2025, 98 (03) : 283 - 296
  • [10] Understanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach
    Irankunda, Georges
    Zhang, Wei
    Abdullahi, Usman Isah
    Fernand, Muhirwa
    David, Byiringiro
    Jean-Petit, Sinamenye
    BUILDINGS, 2025, 15 (03)