Minimizing the number of tardy jobs on a two-stage assembly flowshop

被引:18
作者
Allahverdi, Ali [1 ]
Aydilek, Asiye [2 ]
Aydilek, Harun [3 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Ind & Management Syst Engn, POB 5969, Safat, Kuwait
[2] Gulf Univ Sci & Technol, Dept Econ & Finance, POB 7207, Hawally 32093, Kuwait
[3] Gulf Univ Sci & Technol, Dept Math & Nat Sci, POB 7207, Hawally 32093, Kuwait
关键词
scheduling; assembly flowshop; number of tardy jobs; heuristic;
D O I
10.1080/21681015.2016.1151466
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of minimizing the number of tardy jobs is important as it is directly related to the percentage of on-time shipments, which is often used to rate managers' performance in many manufacturing environments. To the best of our knowledge, the assembly flowshop scheduling problem with this objective has not been addressed so far, and thus is addressed in this paper. Given that the problem is NP-hard, different heuristics are proposed for the problem in this paper. The proposed heuristics are genetic algorithm (GA), improved genetic algorithm (IGA), simulated annealing algorithm with three different neighborhood structures (SA-1, SA-2, SA-3), Dhouib et al.'s simulated annealing algorithm (DSA), and an improved cloud theory-based simulated annealing algorithm (CSA). The heuristics are evaluated based on extensive computational experiments and all the heuristics were run for the same computational time for a fair comparison. The experiments reveal that the overall average errors of DSA, GA, IGA, CSA, SA-1, SA-2, SA-3 were 20.53, 13.49, 11.64, 3.27, 2.81, 1.92, and 0.56, respectively. Therefore, the proposed heuristic of SA-3 reduces the error of DSA, GA, IGA, CSA, SA-1, SA-2 by about 97, 96, 95, 83, 80, and 71%, respectively. All the results are statistically confirmed.
引用
收藏
页码:391 / 403
页数:13
相关论文
共 40 条
[1]  
Al-Anzi F. S., 2006, International Journal of Operations Research, V3, P109
[2]   A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) :80-94
[3]   No-wait flowshop scheduling problem to minimize the number of tardy jobs [J].
Aldowaisan, Tariq A. ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4) :311-323
[4]   A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application [J].
Allahverdi, A ;
Al-Anzi, FS .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) :1056-1080
[5]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[6]   The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2) :166-177
[7]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[8]   Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) :4713-4735
[9]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[10]   The two stage assembly flowshop scheduling problem to minimize total tardiness [J].
Allahverdi, Ali ;
Aydilek, Harun .
JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (02) :225-237