THERMIONIC TOPPING OF THE BOILER OF AN 800-MW POWER GENERATING-UNIT

被引:0
作者
BEREZINETS, PA
KACHALIN, EA
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:636 / 639
页数:4
相关论文
共 50 条
[31]   CERTAIN FEATURES OF AERODYNAMICS OF THE FURNACE CHAMBER IN THE GAS OIL-FIRED TGMP-204P BOILER OF AN 800 MW GENERATING-UNIT WITH A BOTTOM ARRANGEMENT OF BURNERS [J].
CHUPROV, VV ;
USMAN, YM ;
ABRYUTIN, AA ;
ANTONOV, AY ;
ZHIVAEV, AS ;
KOZLOV, VG ;
LEVIN, MM .
THERMAL ENGINEERING, 1990, 37 (02) :66-70
[32]   An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure [J].
Avrutsky G.D. ;
Zakharov A.E. ;
Sargsyan V.A. ;
Frolov M.S. ;
Schwartz A.L. ;
Adamov A.S. .
Therm. Eng., 9 (615-620) :615-620
[33]   HEAT ABSORPTION OF THE HEATING SURFACES OF THE P-57 BOILER IN THE 500 MW PILOT GENERATING-UNIT OPERATING ON EKIBASTUZ COAL [J].
SHLYGIN, VV ;
CHAKRYGIN, VG ;
BARANENKO, VD ;
IVANOV, AG .
THERMAL ENGINEERING, 1981, 28 (05) :279-281
[34]   REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING UNIT. [J].
Thompson, A.R. ;
Hoover, R.M. .
1978,
[35]   WATER-CHEMISTRY CONDITIONS OF THE 1200-MW POWER GENERATING-UNIT AT KOSTROMA CENTRAL POWER-STATION [J].
RAZUMOVSKAYA, ED ;
EZHUNOV, VE .
THERMAL ENGINEERING, 1985, 32 (08) :459-460
[36]   HEAT ENGINEERING PROBLEMS IN DEVELOPMENT OF BOILER UNITS OF POWER-STATIONS WITH THERMIONIC TOPPING [J].
BEREZINETS, PA ;
SHVARTS, AL .
THERMAL ENGINEERING, 1981, 28 (07) :388-390
[37]   800-MW Supercritical Coal-Fired Boilers in Suizhong Power Plant [J].
By Zou Haifeng .
Electricity, 2005, (02) :30-33
[38]   Tests of a P-67 boiler for an 800 MW unit [J].
Vasilyev V.V. ;
Borisov V.N. ;
Petrov V.N. ;
Kardachov A.S. ;
Porozov S.V. ;
Grebenkov P.Yu. ;
Yanov S.R. ;
Nazarov M.N. ;
Maidanik M.N. .
Power Technology and Engineering, 2010, 44 (4) :307-313
[39]   GENERATING-UNIT MODELING IN POWER-SYSTEM ADEQUACY ANALYSIS [J].
BILLINTON, R ;
DEBNATH, K .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1990, 27 (02) :155-165
[40]   DEVELOPMENT OF MEASURES TO IMPROVE THE RELIABILITY OF THE FLANGED JOINTS OF HIGH-PRESSURE HEATERS OF 800-MW POWER GENERATING-UNITS [J].
NOSULKO, DR ;
BUGASOV, AV .
THERMAL ENGINEERING, 1984, 31 (11) :635-637