- [41] Do the Major Steam Turbine Inspections Still Meet the Present-Day Requirements?. Maschinenschaden, 1972, 45 (05): : 169 - 178
- [42] Peaking Heat and Power Plants with Combined Utilization of Steam and Gas Turbine Sets. Teploenergetika, 1978, (04): : 28 - 32
- [43] Three dimensional fluid-solid coupled analytical model of steam turbine bearing Zhongguo Dianji Gongcheng Xuebao, 8 (147-151):
- [44] Improvement of Turbine Units Made at the Kharkov Turbogenerator Plant for Supercritical Steam Parameters. Teploenergetika, 1980, (04): : 24 - 27
- [45] DUAL PRESSURE STEAM/IMMISCIBLE LIQUID CYCLES FOR GAS TURBINE EXHAUST HEAT RECOVERY. Journal of engineering for power, 1982, 104 (01): : 77 - 83
- [46] DIRECT EXTRAPOLATION OF LABORATORY EXPERIMENTS ON STEAM CONDENSATION TO FULL-SIZE TURBINE CONDENSERS. Heat transfer. Soviet research, 1980, 12 (04): : 46 - 47
- [47] Dynamics of Reverse Steam Flow from Preheater to Turbine In Case of Check Valve Sticking. Teploenergetika, 1980, (10): : 41 - 45
- [48] Advantages and Proving of Series Construction of Steam Turbine-Generator Units for Electricity Generation. VGB Kraftwerkstechnik, 1979, 59 (02): : 109 - 114
- [49] Improvement of Steam Turbines of ″S. M. Kirov″ Kharkov Turbine Plant. Energomashinostroenie, 1979, (02): : 32 - 38
- [50] ″ CONVOY ″ SATURATED STEAM TURBINE GENERATOR UNITS FOR NUCLEAR POWER PLANTS WITH PRESSURIZED WATER REACTORS. 1982, V 4 (N 4): : 183 - 186