Case-based allocation of onsite supervisory manpower for construction projects

被引:24
作者
Chen, Jieh-Haur [1 ]
Yang, Li-Ren [2 ]
Chen, W. H. [1 ]
Chang, C. K. [3 ]
机构
[1] Natl Cent Univ, Dept Construct Engn & Management, Taoyuan, Taiwan
[2] Tamkang Univ, Dept Business Adm, New Taipei, Taiwan
[3] Ruentex Construct Co, Taipei, Taiwan
关键词
Allocation; human resource management; onsite; overheads; supervisory manpower costs;
D O I
10.1080/01446190802014778
中图分类号
F [经济];
学科分类号
02 ;
摘要
In the highly competitive worldwide construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of onsite supervisory manpower often offset the profit gained from the project and may even jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of onsite supervisory manpower and its costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects for residential buildings, industrial office buildings, commercial buildings and industrial construction. In the modelling the costs and allocation of onsite supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects with the following characteristics: a non-crashing schedule, a floor area of less than 35 000 m(2), a height of less than 50m, can be accurately predicted and the assignment of supervisory manpower feasibly automated.
引用
收藏
页码:805 / 814
页数:10
相关论文
共 50 条
[1]  
Abdullah S. B., 1997, Malaysian Journal of Computer Science, V10, P10
[2]  
Adrian J. J., 1982, CONSTRUCTION ESTIMAT
[3]  
Arditi D., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P385, DOI 10.1111/0885-9507.00157
[4]  
Arditi D., 1998, J COMPUTER AIDED CIV, V13, P75, DOI DOI 10.1111/0885-9507.00087
[5]  
Assaf S.A., 2001, INT J PROJ MANAG, V19, P295
[6]  
BEER M, 1985, HUMAN RESOURCE MANAG
[7]  
Belout A., 2004, International Journal of Project Management, V22, P1, DOI 10.1016/S0263-7863(03)00003-6
[8]  
BERGMANN R, 1998, METHODOLOGY BUILDING
[9]   Case-based reasoning system and artificial neural networks: A review [J].
Chen, DQ ;
Burrell, P .
NEURAL COMPUTING & APPLICATIONS, 2001, 10 (03) :264-276
[10]  
Cilensek R., 1991, COST ENG, V3, P21