IMPACT OF ERROR RECOVERY ON THE PRODUCTIVITY OF A UNITARY ASSEMBLY CELL

被引:1
作者
KAO, JF
SANDERS, JL
机构
[1] Department of Industrial Engineering, University of Wisconsin, Madison
来源
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 1992年 / 8卷 / 06期
关键词
D O I
10.1109/70.182673
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a model that illustrates the impact of error recovery on the productivity of a unitary assembly cell, performing one assembly operation at a time. At the design stage of an assembly cell, the determination of the appropriate structure for the error recovery requires a consideration of the tradeoff between productivity and yield. This analysis provides a methodology for the justification of various structural alternatives. For an existing unitary assembly cell, the developed model can be used to analyze the system performance and estimate the numbers of components required for a given assembly batch size. A sensitivity analysis of the model can be used to identify ''critical'' operations whose improvement will result in the maximum increase in productivity of the assembly cell.
引用
收藏
页码:730 / 740
页数:11
相关论文
共 21 条
[1]  
[Anonymous], 1968, INTRO PROBABILITY TH
[2]  
Buzacott J. A., 1972, AIIE T, V4, P308
[3]   ERROR RECOVERY - A CONDITION-ORIENTED REPLANNING APPROACH [J].
CHANG, KH ;
EDHALA, M .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1989, 19 (01) :130-134
[4]  
DALLERY Y, 1991, MASI9118 U PIERRE MA
[5]  
GINI M, 1983, 8TH P INT JOINT C AR, P821
[6]  
GLASSERMAN P, 1991, GRADIENT ESTIMATION
[7]  
KAO JF, 1992, 911 U WISC DEP IND E
[8]  
LEE MH, 1983, 6TH P BRIT ROB ASS A, P217
[9]  
LEE MH, 1983, P INT J C, P824
[10]   DYNAMIC ROUTING IN REENTRANT FLEXIBLE MANUFACTURING SYSTEMS. [J].
Maimon, Oded Z. ;
Choong, Yong F. .
Robotics and Computer-Integrated Manufacturing, 1987, 3 (03) :295-300