WORKPIECES SCHEDULING IN A FLEXIBLE MANUFACTURING CELL

被引:0
|
作者
TEIXEIRA, E [1 ]
YAMAKAMI, A [1 ]
机构
[1] UNIV ESTADUAL CAMPINAS,CAMPINAS,SP,BRAZIL
来源
PRODUCTION MANAGEMENT METHODS | 1994年 / 19卷
关键词
NONNUMERICAL ALGORITHMS AND PROBLEMS; PROBLEM SOLVING; CONTROL METHODS AND SEARCH; COMPUTER-AIDED ENGINEERING;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The purpose of this paper is to present a heuristic algorithm for the problem of workpieces scheduling in a Flexible Manufacturing Cell (FMC). The problem of workpieces scheduling in an FMC is to determine how and when the workpieces could use the cell resources. The objective is to determine the set of starting times of each transport,done by the robot,of each workpiece to each operation which exploits the machine flexibility after identifing the dynamic bottleneck,while minimizing the makespan.
引用
收藏
页码:217 / 224
页数:8
相关论文
共 50 条
  • [1] A INTELLIGENT SCHEDULING SYSTEM FOR FLEXIBLE MANUFACTURING CELL
    SHI, HB
    XUE, JS
    IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 3 : 721 - 728
  • [2] Analysis of flexible manufacturing equipment for rotational workpieces
    Analyse flexibler Fertigungsanlagen fuer rotationssymmetrische Werkstuecke
    1990, (123):
  • [3] ROBOT TASK-SCHEDULING IN A FLEXIBLE MANUFACTURING CELL
    KING, RE
    HODGSON, TJ
    CHAFEE, FW
    IIE TRANSACTIONS, 1993, 25 (02) : 80 - 87
  • [4] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    Prabaharan, T.
    Nakkeeran, P.R.
    Jawahar, N.
    International Journal of Advanced Manufacturing Technology, 2006, 29 (7-8): : 729 - 745
  • [5] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    T. Prabaharan
    P.R. Nakkeeran
    N. Jawahar
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 729 - 745
  • [6] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    Prabaharan, T.
    Nakkeeran, P. R.
    Jawahar, N.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (7-8): : 729 - 745
  • [7] Flexible manufacturing cell dynamic scheduling by immune algorithm
    Yu, Jian-Jun
    Sun, Shu-Dong
    Wang, Jun-Qiang
    Wu, Xiu-Li
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2007, 28 (02): : 464 - 469
  • [8] EXPERT SCHEDULING SYSTEM FOR A PROTOTYPE FLEXIBLE MANUFACTURING CELL - A FRAMEWORK
    GUPTA, MC
    JUDT, C
    GUPTA, YP
    BALAKRISHNAN, S
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (04) : 363 - 378
  • [9] CAPACITY, COST AND SCHEDULING ANALYSIS FOR A MULTIPRODUCT FLEXIBLE MANUFACTURING CELL
    CHAKRAVARTY, AK
    SHTUB, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (08) : 1143 - 1156
  • [10] Modeling and scheduling a flexible manufacturing cell with parallel processing capability
    Naderi, Bahman
    Azab, Ahmed
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2015, 11 : 18 - 27