Life cycle cost analysis on the operation of power generation

被引:21
作者
Sinisuka, Ngapuli [1 ]
Nugraha, Herry [1 ]
机构
[1] Bandung Inst Technol, Sch Elect Engn & Informat, Bandung, Indonesia
关键词
Life cycle cost analysis; Power generation; Assets management; Cost and benefit; Cost analysis;
D O I
10.1108/13552511311304447
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose -The purpose of this paper is to study the life cycle cost (LCC) on the operation of power generation. LCC is the total cost of ownership including the cost of the project or asset acquisition, operation and maintenance, and disposal. LCC includes both deterministic costs (such as acquisition costs, improvement costs and disposal costs) and probabilistic (such as the costs of failure, repairs, spare parts, downtime, lost gross margin). Most of the probabilistic costs are associated directly with the reliability and maintenance characteristics of the system. Design/methodology/approach -To be able to analyze failure data using appropriate cost profile in order to represent the fact that each failure has different prices, in different time periods at an economical cycle the new methodology of LCCA Diagram is proposed. Developing criticality ranking of sub-system, calculating values of Weibull Shape Factor b and Weibull Characteristic Life Z for each sub-system, calculating the time to failure of sub-system, calculating the mean time to failure of sub-system using Monte Carlo simulation, determining several alternatives, failure mode and effects analysis and root cause failure analysis are parts of the methodology. Findings -To give a sample of case study, the LCC on the operation of coal fired power plant (CFPP) 330 MW is analyzed. Five alternatives calculation of LCC will be simulated. Graph of cash flow, break-even graph, and graph of cost/benefit versus risk made for a period of 30 years can be used to asses an effective management program and costs of power plant with a low risk. Originality/value -The paper suggests that LCC can be used to asses an effective management program and costs of power plant with a low risk.
引用
收藏
页码:5 / +
页数:21
相关论文
共 7 条
[1]  
Barringer H.P., 2003, INT C MAINT SOC ICOM, P20
[2]  
BARRINGER HP, 1996, 5 INT C PROC PLANT R
[3]  
Blanchard Benjamin S., 1995, MAINTAINABILITY KEY
[4]  
Fabrycky W., 1991, LIFE CYCLE COST EC A
[5]  
Landers Richard R., 1996, PRODUCT ASSURANCE DI
[6]  
RAHEJA DG, 1991, ASSURANCE TECHNOLOGI
[7]  
[No title captured]