Renewal in construction projects: tracing effects of client requirements

被引:37
作者
Havenvid, Malena Ingemansson [1 ]
Hulthen, Kajsa [2 ]
Linne, Ase [3 ]
Sundquist, Viktoria [2 ]
机构
[1] NTNU, Dept Ind Econ & Technol Management, Trondheim, Norway
[2] Chalmers Univ Technol, Dept Technol Management & Econ, Gothenburg, Sweden
[3] Uppsala Univ, Dept Engn Sci, Uppsala, Sweden
关键词
Client; innovation; inter-firm collaboration; networks; project; renewal;
D O I
10.1080/01446193.2016.1208364
中图分类号
F [经济];
学科分类号
02 ;
摘要
Several studies identify clients as important drivers of innovation in the construction industry. How clients contribute to innovation is however less investigated. In two case studies of health care construction projects, we investigate how client requirements create renewal in the form of intra- as well as inter-project effects. Using an inter-organizational framework of actors, resources and activities (the ARA model), it is possible to identify a variation of effects. The paper concludes that both client requirements and their associated renewal effects are results of interaction in time as well as space. Renewal effects crossing individual projects are dependent on relationships among two or more actors that continue to interact in subsequent projects. In addition, these effects relate to several dimensions of interaction and include how actors relate in new ways, how resources are combined and how activities are organized. Thus, by adopting an interactive perspective, it is possible to reveal how construction clients can contribute to renewal such as innovation and learning, directly and indirectly, within and across projects. Finally, we suggest that managers need to consider the role of long-term business relationships in achieving increased renewal in construction.
引用
收藏
页码:790 / 807
页数:18
相关论文
共 66 条
[1]   Project-based learning: Building communities of reflective practitioners [J].
Ayas, K ;
Zeniuk, N .
MANAGEMENT LEARNING, 2001, 32 (01) :61-76
[2]  
Blayse A. M., 2004, Construction Innovation, V4, P143, DOI 10.1191/1471417504ci073oa
[3]   Wakes of innovation in project networks: The case of digital 3-D representations in architecture, engineering, and construction [J].
Boland, Richard J., Jr. ;
Lyytinen, Kalle ;
Yoo, Youngjin .
ORGANIZATION SCIENCE, 2007, 18 (04) :631-647
[4]   Building project capabilities: From exploratory to exploitative learning [J].
Brady, T ;
Davies, A .
ORGANIZATION STUDIES, 2004, 25 (09) :1601-1621
[5]  
Brandon P., 2008, CLIENTS DRIVING INNO, DOI [10.1002/9781444301342, DOI 10.1002/9781444301342]
[6]  
Bresnen M., 2001, ENG CONSTRUCTION ARC, V8, P335, DOI DOI 10.1046/J.1365-232X.2001.00216.X
[7]  
Briscoe G.H., 2004, CONSTR MANAG ECON, V22, P193, DOI [10.1080/0144619042000201394, DOI 10.1080/0144619042000201394]
[8]   Partnering relationships in construction: A literature review [J].
Bygballe, Lena E. ;
Jahre, Marianne ;
Sward, Anna .
JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2010, 16 (04) :239-253
[9]   Balancing value creating logics in construction [J].
Bygballe, Lena Elisabeth ;
Jahre, Marianne .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (07) :695-704
[10]  
Cherns A, 1984, CONSTR MANAG EC, V2, P177, DOI DOI 10.1080/01446198400000016