BOUNDS ON MULTIPROCESSING TIMING ANOMALIES

被引:1310
作者
GRAHAM, RL
机构
关键词
D O I
10.1137/0117039
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Author studies typical model of multiprocessing system, and determines precise extent by which execution time for set of tasks can be ifluenced because of timing anomalies; special case of model is shown to generate interesting number-theoretic question.
引用
收藏
页码:416 / &
相关论文
共 10 条
[1]  
BELL TELEPH LAB IN, C MURRAY HILL
[2]   MULTIPROGRAM SCHEDULING .1.2. INTRODUCTION AND THEORY [J].
CODD, EF .
COMMUNICATIONS OF THE ACM, 1960, 3 (06) :347-350
[3]   BOUNDS FOR CERTAIN MULTIPROCESSING ANOMALIES [J].
GRAHAM, RL .
BELL SYSTEM TECHNICAL JOURNAL, 1966, 45 (09) :1563-+
[4]  
HELLER J, 1961, J ACM, V8, P426, DOI 10.1145/321075.321086
[5]  
Kelley John L., 1991, General Topology
[6]  
LIEBESMAN B, TO BE PUBLISHED
[7]   PRODUCTION AND STABILIZATION OF REAL-TIME TASK SCHEDULES [J].
MANACHER, GK .
JOURNAL OF THE ACM, 1967, 14 (03) :439-&
[8]  
OCHSNER BP, 1966, 44 BELL LAB REC, P59
[9]  
RICHARDS P, 1960, TDB6027 TECHN OP INC
[10]  
ROTHKOPF M, 1964, MIT2 OP RES CENT INT