Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA)

被引:32
作者
Chen, Yong [1 ]
Lu, Huanqing [2 ]
Lu, Wenxue [3 ]
Zhang, Ning [3 ]
机构
[1] Tianjin Univ, Dept Construct Management, Tianjin, Peoples R China
[2] East Carolina Univ, Greenville, NC USA
[3] Tianjin Univ, Sch Management, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
Construction industry; Project management; Project systems; Data analysis; China;
D O I
10.1108/09699981011090215
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Selecting a proper project delivery system is one of the critical issues for the success of a project. This paper discusses the application of project delivery systems in China and the existing project delivery system selection methods, analyzes project objectives and indicators influencing the selection of project delivery systems, and aims at finding an appropriate method to select project delivery systems. Design/methodology/approach - A survey was conducted by postal questionnaire and Multivariate Statistical Analysis was applied to analyze the project data. A robust model was developed to analyze the selection of project delivery systems. Findings - The results of survey and analysis show that design-bid-build (DBB)/project management (DBB + PM), design-build (DB)/engineering, procurement and construction (EPC)/Turnkey, multi-stage DB/EPC and EP + C are commonly used in China. The differences between DBB and DBB + PM, and differences between DB/EPC and Turnkey in China are not significant. Weights of project objectives in each project delivery system and the ranking of indicators influencing the selection of project delivery systems are acquired. Originality/value - Analysis was conducted with a robust model instead of traditional model in consideration of efficiency. This research may assist owners in Mainland China in selecting project delivery systems, improve project performance, and encourage efficiency in project delivery process.
引用
收藏
页码:598 / +
页数:18
相关论文
共 38 条
  • [11] Comparative analysis of owner goals for design/build projects
    del Puerto, Carla Lopez
    Gransberg, Douglas D.
    Shane, Jennifer S.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (01) : 32 - 39
  • [12] Owner's Risks versus Control in Transit Projects
    Ghavamifar, Kamran
    Touran, Ali
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (04) : 230 - 233
  • [13] Hong W., 2007, CONSTRUCTION EC, P18
  • [14] Hu W., 2007, W CHINA EXPLORATION, V19, P230
  • [15] Koppinen T., 2004, VTT PUBLICATIONS
  • [16] Developing a decision support system for building project procurement
    Kumaraswamy, MM
    Dissanayaka, SM
    [J]. BUILDING AND ENVIRONMENT, 2001, 36 (03) : 337 - 349
  • [17] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [18] Luu C., 2003, ENG CONSTR ARCHIT MA, V10, P209, DOI [10.1108/09699980310478458, DOI 10.1108/09699980310478458]
  • [19] A strategy for evaluating a fuzzy case-based construction procurement selection system
    Luu, DT
    Ng, ST
    Chen, SE
    Jefferies, M
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2006, 37 (03) : 159 - 171
  • [20] Formulating procurement selection criteria through case-based reasoning approach
    Luu, DT
    Ng, ST
    Chen, SE
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (03) : 269 - 276