Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA)

被引:32
作者
Chen, Yong [1 ]
Lu, Huanqing [2 ]
Lu, Wenxue [3 ]
Zhang, Ning [3 ]
机构
[1] Tianjin Univ, Dept Construct Management, Tianjin, Peoples R China
[2] East Carolina Univ, Greenville, NC USA
[3] Tianjin Univ, Sch Management, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
Construction industry; Project management; Project systems; Data analysis; China;
D O I
10.1108/09699981011090215
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Selecting a proper project delivery system is one of the critical issues for the success of a project. This paper discusses the application of project delivery systems in China and the existing project delivery system selection methods, analyzes project objectives and indicators influencing the selection of project delivery systems, and aims at finding an appropriate method to select project delivery systems. Design/methodology/approach - A survey was conducted by postal questionnaire and Multivariate Statistical Analysis was applied to analyze the project data. A robust model was developed to analyze the selection of project delivery systems. Findings - The results of survey and analysis show that design-bid-build (DBB)/project management (DBB + PM), design-build (DB)/engineering, procurement and construction (EPC)/Turnkey, multi-stage DB/EPC and EP + C are commonly used in China. The differences between DBB and DBB + PM, and differences between DB/EPC and Turnkey in China are not significant. Weights of project objectives in each project delivery system and the ranking of indicators influencing the selection of project delivery systems are acquired. Originality/value - Analysis was conducted with a robust model instead of traditional model in consideration of efficiency. This research may assist owners in Mainland China in selecting project delivery systems, improve project performance, and encourage efficiency in project delivery process.
引用
收藏
页码:598 / +
页数:18
相关论文
共 38 条
  • [1] Al Khalil M. I., 2002, INT J PROJ MANAG, V20, P469, DOI [10.1016/S0263-7863(01)00032-1, DOI 10.1016/S0263-7863(01)00032-1]
  • [2] Project procurement system selection model
    Alhazmi, T
    McCaffer, R
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03): : 176 - 184
  • [3] A PROCEDURE FOR RANKING EFFICIENT UNITS IN DATA ENVELOPMENT ANALYSIS
    ANDERSEN, P
    PETERSEN, NC
    [J]. MANAGEMENT SCIENCE, 1993, 39 (10) : 1261 - 1265
  • [4] ANDERSON S, 2003, CONSTR RES C WINDS C, P703
  • [5] Chan A.P., 2001, CONSTR MANAG ECON, V19, P699, DOI [10.1080/01446190110066128, DOI 10.1080/01446190110066128]
  • [6] Framework of success criteria for design/build projects
    Chan, APC
    Scott, D
    Lam, EWM
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 120 - 128
  • [7] Fuzzy procurement selection model for construction projects
    Chan, Caroline T. W.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (06) : 611 - 618
  • [8] Chang C.-Y., 2002, CONSTRUCTION MANAGEM, V20, P275, DOI [10.1080/01446190110117608, DOI 10.1080/01446190110117608]
  • [9] MEASURING EFFICIENCY OF DECISION-MAKING UNITS
    CHARNES, A
    COOPER, WW
    RHODES, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1978, 2 (06) : 429 - 444
  • [10] Improving objectivity in procurement selection
    Cheung, SO
    Lam, TI
    Wan, YW
    Lam, KC
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (03) : 132 - 139