共 50 条
[21]
The design and construction of temporary works for Limerick Immersed Tube Tunnel
[J].
CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1,
2013,
:805-808
[22]
Construction Techniques in Crossing Water-rich Sand Stratum of Deep Buried Large Tunnels
[J].
PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017),
2017, 76
:795-798
[24]
Cooling tower for a pharmaceutical process cooling water system - New construction using construction management project delivery
[J].
Engineered Systems,
2019, 36 (11)
[26]
Vibration prediction of immersed tube tunnels under vehicle loads based on Timoshenko beam theory
[J].
Wei, Gang (weig@zucc.edu.cn),
1627, Chinese Society of Civil Engineering (40)
:1627-1634
[27]
Influence of foundation settlement on mechanical performance of shear keys of segment joints in immersed tube tunnels
[J].
Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,
2015, 37 (12)
:2235-2244
[28]
Numerical study on Sinking Mooring System of Immersed Tube Tunnel Construction
[J].
PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING MATERIALS AND TECHNOLOGY,
2015, 38
:230-234
[29]
Steel immersed tube tunnels where tunnel boring machines cannot operate - Yarra River crossing construction on the Melbourne main sewer replacement project
[J].
Australas. Tunn. Conf.: Dev. Undergr. Space, Proc.,
(29-37)
[30]
Hong Kong Airport Railway Western Immersed Tube tunnel - Construction
[J].
IMMERSED TUNNEL TECHNIQUES 2,
1997,
:273-282