Field test research on treatment effect of embankment foundation in class. dead-weight collapsible loess zone along railway passenger dedicated line
被引:0
作者:
Wang Xiao-jun
论文数: 0引用数: 0
h-index: 0
机构:
Zhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Wang Xiao-jun
[1
]
Wang Wen-di
论文数: 0引用数: 0
h-index: 0
机构:
Ningbo Univ Technol, Sch Architecture Engn, Ningbo 315211, Zhejiang, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Wang Wen-di
[2
]
Li Ming
论文数: 0引用数: 0
h-index: 0
机构:
China Commun Construct Co Ltd, Nav Engn Bur 2, Wuhu 241007, Anhui, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Li Ming
[3
]
Wei Yong-liang
论文数: 0引用数: 0
h-index: 0
机构:
Northwest Res Inst Co Ltd, China Railway Engn Corp, Lanzhou 730000, Gansu, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Wei Yong-liang
[4
]
Yang Yin-hai
论文数: 0引用数: 0
h-index: 0
机构:
Northwest Res Inst Co Ltd, China Railway Engn Corp, Lanzhou 730000, Gansu, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Yang Yin-hai
[4
]
Qu Yao-hui
论文数: 0引用数: 0
h-index: 0
机构:
Northwest Res Inst Co Ltd, China Railway Engn Corp, Lanzhou 730000, Gansu, Peoples R ChinaZhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
Qu Yao-hui
[4
]
机构:
[1] Zhejiang Univ, Ningbo Inst Technol, Ningbo 315100, Zhejiang, Peoples R China
[2] Ningbo Univ Technol, Sch Architecture Engn, Ningbo 315211, Zhejiang, Peoples R China
[3] China Commun Construct Co Ltd, Nav Engn Bur 2, Wuhu 241007, Anhui, Peoples R China
[4] Northwest Res Inst Co Ltd, China Railway Engn Corp, Lanzhou 730000, Gansu, Peoples R China
The experimental section is located in the class. dead-weight collapsible loess site and is composed of three different kinds of loess foundation treatment measures. The transition sections without foundation treatment exist between them. All 22 m depth of collapsible loess is treated in zone of piles with down hole dynamic compaction. The upper 15 m depth of collapsible loess is treated in zone of cement soil compaction piles. The upper 6 m depth of collapsible loess is treated in zone of dynamic compaction. The results show that the collapsibility of loess within treatment depth has been completely eliminated. Their bearing capacity is higher than the standard value. The composite foundation settlements of piles with down hole dynamic compaction and cement soil compaction piles are less than 15 mm after construction for high-speed railway; but the dynamic compaction foundation can not meet the same requirement. In zone of pile with down hole dynamic compaction, the minimum and average coefficients of compaction are respectively more than the standard values of 0.88 and 0.93; but the average coefficient of compaction and compression modulus of piles are respectively less than the standard values of 0.97 and 100 MPa. In zone of piles with cement-soil compaction piles, the minimum and average coefficients of compaction, or the average coefficient of compaction and compression modulus of piles are also less than the same standard values. Average compression modulus of dynamic foundation is less than the standard value of 15 MPa. The reasonable values of test standard need further study.
引用
收藏
页码:318 / 324
页数:7
相关论文
共 4 条
[1]
GUO Dao-biao, 2008, J NO COMMUNICATION, P71
[2]
QIAN Zheng-yu, 2008, J RAILWAY ENG SOC, P71
[3]
TIAN Bao-hua, 2005, J RAILWAY CONSTRUCTI, P6
[4]
[王小军 Wang Xiaojun], 2012, [铁道学报, Journal of the China Railway Society], V34, P83