finite element method;
shield tunnel;
numerical simulation;
D O I:
暂无
中图分类号:
P5 [地质学];
学科分类号:
0709 ;
081803 ;
摘要:
The ground settlements and the disturbance of soil around tunnel by shield driven are summarized by means of measurement of Tianjin No. 1 subway line project. According to the actual engineering, a 3D FEM model is proposed to simulate the excavating of shield tunnel by means of general FEM program ABAQUS; the model change method is put forward to imitate moving-forward shield process. And the results of simulation are compared with the results of measurement.