共 21 条
- [1] Ragatz, Mabert, An Evaluation of Order Release Mechanisms in a Job Shop Environment, Decision Sciences, 19 v, pp. 167-189, (1988)
- [2] Wight, Input/Output Control: A Real Handle on Lead Time, Production and Inventory Management, pp. 9-31, (1970)
- [3] Glassey, Resende, Closed-Loop Release Control for VLSI Circuit Manufacturing, IEEE Transactions on Semiconductor Manufacturing, 1 v, pp. 36-46, (1988)
- [4] Wein, Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1 v, pp. 115-130, (1988)
- [5] Baker, The Effects of Input Control in a Simple Scheduling Model, Journal of Operations Management, 4 v, pp. 99-112, (1984)
- [6] Burbidge, Production Flow Analysis for Planning Group Technology, (1989)
- [7] Bruno, Downey, Complexity of Task Sequencing with Deadlines Setup Times and Changeover Costs, SIAM Journal on Computing, 7 v, pp. 393-404, (1978)
- [8] Du, Leung, Minimizing Total Tardiness on One Machine is NP-Hard, Mathematics of Operations Research, 15 v, pp. 483-495, (1990)
- [9] Bhaskaran, Pinedo, Dispatching, Handbook of Industrial Engineering, (1991)
- [10] Koulamas, The Total Tardiness Problem: Review and Extensions, Operations Research, 42 v, pp. 1025-1040, (1994)