SCHEDULING AND ORDER RELEASE IN A SINGLE-STAGE PRODUCTION SYSTEM

被引:22
作者
ASHBY, JR
UZSOY, R
机构
[1] General Motors Corp., Warren, MI
[2] Purdue University, West Lafayette, IN
关键词
LOADING AND SCHEDULING; PRODUCTION CONTROL;
D O I
10.1016/0278-6125(95)98881-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We develop a set of scheduling heuristics that integrate order release, group scheduling, and order sequencing for a make-to-order manufacturing facility organized into group technology cells. The procedures take into account both order due dates and sequence-dependent setup times. Simulation experiments are used to compare the performance of the procedures to current practice. Results show that the new scheduling policies, which consider setup times as well as due dates in both order release and job sequencing decisions, substantially improve due date performance and show that both order release policies and dispatching rules have significant effects on system performance.
引用
收藏
页码:290 / 306
页数:17
相关论文
共 21 条
  • [1] Ragatz, Mabert, An Evaluation of Order Release Mechanisms in a Job Shop Environment, Decision Sciences, 19 v, pp. 167-189, (1988)
  • [2] Wight, Input/Output Control: A Real Handle on Lead Time, Production and Inventory Management, pp. 9-31, (1970)
  • [3] Glassey, Resende, Closed-Loop Release Control for VLSI Circuit Manufacturing, IEEE Transactions on Semiconductor Manufacturing, 1 v, pp. 36-46, (1988)
  • [4] Wein, Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1 v, pp. 115-130, (1988)
  • [5] Baker, The Effects of Input Control in a Simple Scheduling Model, Journal of Operations Management, 4 v, pp. 99-112, (1984)
  • [6] Burbidge, Production Flow Analysis for Planning Group Technology, (1989)
  • [7] Bruno, Downey, Complexity of Task Sequencing with Deadlines Setup Times and Changeover Costs, SIAM Journal on Computing, 7 v, pp. 393-404, (1978)
  • [8] Du, Leung, Minimizing Total Tardiness on One Machine is NP-Hard, Mathematics of Operations Research, 15 v, pp. 483-495, (1990)
  • [9] Bhaskaran, Pinedo, Dispatching, Handbook of Industrial Engineering, (1991)
  • [10] Koulamas, The Total Tardiness Problem: Review and Extensions, Operations Research, 42 v, pp. 1025-1040, (1994)