Quantified risk assessment in railway system design and operation

被引:5
|
作者
Haile, JP
机构
[1] British Rail Safety Directorate, London, NW1 1DZ
关键词
risk assessment; safety; QRA; railways;
D O I
10.1002/qre.4680110608
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over the last few years quantified risk assessment (QRA), a technique developed in the process industries, has moved into the railway and mass transport arenas. Many quantified risk assessments are now appearing covering varying aspects of railway operation and design. This paper highlights the strengths and weaknesses of the QRA technique, with specific reference to its use in railway system design and operation. Suggestions are made as to how best to manage and present a QRA, and these are illustrated in a section explaining the systematic approach of CrossRail, a joint London Underground/British Rail/Railtrack pound 2 billion railway for London. Throughout this paper it is stressed that good QRA comes from management of the process and not of the 'final figure'. The paper concludes with a listing of recommendations that are considered to be the minimum needed for the future progress of railway QRAs. Consequently the paper will be of special interest to those railway organizations undertaking or managing a QRA for the first time. Special reference is made to the use of QRAs in the presentation of Railway Safety Cases and project design.
引用
收藏
页码:439 / 443
页数:5
相关论文
共 50 条
  • [41] Design of a security risk management system for power system dispatching and operation: Part one. Concepts and design of architecture and function
    Wen, Y. (yunfeng.8681@163.com), 2013, Automation of Electric Power Systems Press (37): : 66 - 73
  • [42] GORA: a Grid Operation Risk Assessment software
    Yang, Yang
    Qin, Chao
    Zeng, Yuan
    Liu, Yanli
    Su, Yinsheng
    Li, Peng
    PROCEEDINGS OF THE 2016 IEEE REGION 10 CONFERENCE (TENCON), 2016, : 525 - 529
  • [43] Design of a computer-aided system for risk assessment on information systems
    Liao, GY
    Song, CH
    37TH ANNUAL 2003 INTERNATIONAL CARNAHAN CONFERENCE ON SECURITY TECHNOLOGY, PROCEEDINGS, 2003, : 157 - 162
  • [44] A Case Based System for Oil and Gas Well Design with Risk Assessment
    Simon Kravis
    Rosemary Irrgang
    Applied Intelligence, 2005, 23 : 39 - 53
  • [45] Design and validation of the Medusa supply chain risk assessment methodology and system
    Papastergiou, Spyridon
    Polemi, Nineta
    Kotzanikolaou, Panayiotis
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2018, 14 (01) : 1 - 39
  • [46] A case based system for oil and gas well design with risk assessment
    Kravis, S
    Irrgang, R
    APPLIED INTELLIGENCE, 2005, 23 (01) : 39 - 53
  • [47] Risk Bayesian Assessment Approach to HOF-based Ship Operation in Harbour
    Hu Shenping
    Cai Cunqiang
    Fang Quangen
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1954 - 1960
  • [48] Risk assessment model approach for dangerous goods transported by railway
    Cheng J.
    Wen C.
    Journal of Transportation Security, 2011, 4 (4) : 351 - 359
  • [49] Quantitative Security Risk Assessment and Management for Railway Transportation Infrastructures
    Flammini, Francesco
    Gaglione, Andrea
    Mazzocca, Nicola
    Pragliola, Concetta
    CRITICAL INFORMATION INFRASTRUCTURES SECURITY, 2009, 5508 : 180 - +
  • [50] Risk Assessment and Multi-objective Operation Optimization of AC/DC Hybrid Distribution System
    Xiao H.
    Pei W.
    Deng W.
    Zhang S.
    Ma T.
    Kong L.
    Gaodianya Jishu/High Voltage Engineering, 2020, 46 (10): : 3488 - 3499