We performed a two-year case study on the ramp-up of a large flexible assembly system in a Midwestern automotive components plant. The new system was designed to be a creative replication of technology already in operation in the technology supplier's firm and was purchased under a broad corporate alliance agreement as well as a detailed adoption contract. Although the project met its installation schedule, production targets, and direct labor cost savings objectives, the installation of this innovative, partially-tended assembly system raised several issues and questions regarding the optimal part mix schedule, quality standards, and maintenance schedules. We hypothesize that a curvilinear relationship exists between supplier-user satisfaction and flexibility outcomes. Moderate levels of satisfaction appear to maximize the ratio of part families per hour change-over capability of a new flexible system.
引用
收藏
页码:25 / 37
页数:13
相关论文
共 31 条
[1]   RELATION OF COLLABORATIVE INTERPERSONAL RELATIONSHIPS TO INDIVIDUAL SATISFACTION AND ORGANIZATIONAL PERFORMANCE [J].
ARAM, JD ;
MORGAN, CP ;
ESBECK, ES .
ADMINISTRATIVE SCIENCE QUARTERLY, 1971, 16 (03) :289-297
[2]  
BEER M, 1976, HDB IND ORG PSYCHOL
[3]   TEAM BUILDING - ONE APPROACH TO ORGANIZATIONAL DEVELOPMENT [J].
CROCKETT, WJ .
JOURNAL OF APPLIED BEHAVIORAL SCIENCE, 1970, 6 (03) :291-&
[4]  
CZEIPEL JA, 1975, ACAD MANAGE J, V18, P6
[5]  
DAVIS DD, 1986, MANAGING TECHNOLOGIC
[6]  
DeMeuse K.P., 1981, GROUP ORGAN STUD, V6, P357, DOI [10.1177/105960118100600311, DOI 10.1177/105960118100600311]
[7]   BUILDING THEORIES FROM CASE-STUDY RESEARCH [J].
EISENHARDT, KM .
ACADEMY OF MANAGEMENT REVIEW, 1989, 14 (04) :532-550
[8]  
Ettlie J. E., 1991, International Journal of Flexible Manufacturing Systems, V3, P309, DOI 10.1007/BF00170211
[9]  
Ettlie J. E., 1986, MANAGING TECHNOLOGIC, P72
[10]  
Ettlie J. E., 1988, TAKING CHARGE MANUFA