Progressive trade credit policy in a supply chain with and without stock-out for supplier's lead time under inflationary and fuzzy environment

被引:5
作者
Singh, Chaman [1 ]
Singh, S. R. [2 ]
机构
[1] Univ Delhi, Acharya Narendra Dev Coll, Dept Math, New Delhi 19, India
[2] DN Coll, Dept Math, Meerut, Uttar Pradesh, India
关键词
fuzzy environment; inflation; lead time; trade credit;
D O I
10.1080/21642583.2015.1018555
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we have developed a progressive trade credit model with and without stock-out for retailer under supplier's promised lead time incorporating the effect of inflation and time value of money. Supplier is not always in a position to fulfil retailer's request at any time, and thus forced to adopt new policies to deal with the situation. To deal with the situation, the supplier does not hold the inventory indeed, but produces the items whenever they are demanded and promises a certain lead time. Therefore, the retailer has the choices to have the shortage or not during the promised lead time period. This paper investigates different situations where the supplier promises the lead time and permissible delay in payments under the circumstances of retailer's choice to have the shortages or not. Finally, numerical examples along with sensitivity analysis are presented to illustrate the proposed model.
引用
收藏
页码:284 / 299
页数:16
相关论文
共 21 条
[1]   An inventory model for deteriorating items with partial backlogging and permissible delay in payments [J].
Chang, HJ ;
Dye, CY .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2001, 32 (03) :345-352
[2]  
Ching-Jong Liao, 1991, International Journal of Operations & Production Management, V11, P72, DOI 10.1108/EUM0000000001287
[3]   An ordering policy with allowable shortage and permissible delay in payments [J].
Chung, Kun-Jen ;
Huang, Chao-Kuei .
APPLIED MATHEMATICAL MODELLING, 2009, 33 (05) :2518-2525
[4]   From supply chain to demand chain: the role of lead time reduction in improving demand chain performance [J].
de Treville, S ;
Shapiro, RD ;
Hameri, AP .
JOURNAL OF OPERATIONS MANAGEMENT, 2004, 21 (06) :613-627
[5]  
Dipak K. J., 2013, J UNCERTAINTY ANAL A, V1, P1
[6]   Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand [J].
Glock, Christoph H. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (01) :37-44
[7]   Optimal ordering decision for deteriorating items with expiration date and uncertain lead time [J].
Hsu, Ping-Hui ;
Wee, Hui Ming ;
Teng, Hui-Ming .
COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 52 (04) :448-458
[8]   Optimal replenishment policy for the EPQ model with permissible delay in payments and allowable shortages [J].
Hu, Fei ;
Liu, Dongyi .
APPLIED MATHEMATICAL MODELLING, 2010, 34 (10) :3108-3117
[9]   Retailer's pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments [J].
Hwang, H ;
Shinn, SW .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (06) :539-547
[10]   An EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment [J].
Khanra, S. ;
Ghosh, S. K. ;
Chaudhuri, K. S. .
APPLIED MATHEMATICS AND COMPUTATION, 2011, 218 (01) :1-9