共 16 条
[1]
Charpentier J. C., 1976, Chemical Engineering Journal, V11, P161, DOI 10.1016/0300-9467(76)80038-X
[5]
SCALE UP OF PILOT-PLANT DATA FOR CATALYTIC HYDROPROCESSING
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1973, 12 (03)
:328-334
[7]
Mears D. E., 1974, ADV CHEM SER, V133, P218
[8]
Midoux N., 1976, J CHEM ENG JAPAN, V9, P350, DOI [10.1252/jcej.9.350, DOI 10.1252/JCEJ.9.350]
[9]
EFFECT OF HOLDUP INCOMPLETE CATALYST WETTING AND BACKMIXING DURING HYDROPROCESSING IN TRICKLE BED REACTORS
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1975, 14 (03)
:315-322
[10]
Sato Y., 1973, J CHEM ENG JPN, V6, P147