Critical failure factors of public-private partnership low-cost housing program in Thailand

被引:35
作者
Trangkanont, Surangkana [1 ]
Charoenngam, Chotchai [1 ]
机构
[1] Asian Inst Technol, Sch Engn & Technol, Pathum Thani, Thailand
关键词
Public-private partnerships (PPPs); Thailand; Critical failure factors (CFFs); Low-cost housing (LCH) programme;
D O I
10.1108/ECAM-04-2012-0038
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose-Numerous studies to date have demonstrated the public-private partnership (PPP) project procurement method's failure to deliver low-cost housing (LCH) to low-income groups (LIGs) in developing countries. The purpose of this paper is to investigate critical failure factors (CFFs), and how they cause the failure of PPP-LCH program. Design/methodology/approach-Grounded Theory methodology was used to gather and analyze the data in order to identify, categorize, and develop the logically causal relationships among CFFs that cause PPP-LCH program failure. Findings-Ten CFFs in various phases of PPP-LCH project life cycle caused PPP-LCH program failure. Some CFFs resulted from ineffective PPP policy and strategy, while some were beyond the control of the project/program management team. These CFFs were inter-/intra-related to one another in a particular way. Originality/value-Despite the increase in PPP-LCH projects/programs for LIGs in practice and the prevalence of failure, the studies of PPP-LCH project/program failure still suffer from insufficient conceptual clarity about the causes of these failures. The lessons learned, to some extent, help decision makers in both public and private sectors to reduce the probability of the PPP-LCH project/program failure by clearly explaining the nature of each CFF.
引用
收藏
页码:421 / +
页数:24
相关论文
共 37 条
[1]   Private Finance Initiative in the healthcare sector: trends and risk assessment [J].
Akintoye, Akintola ;
Chinyio, Ezekiel .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (06) :601-+
[2]   Build-operate-transfer in infrastructure projects in the United States [J].
Algarni, Ayed Muhammad ;
Arditi, David ;
Polat, Gul .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (10) :728-735
[3]  
[Anonymous], 2010, PROJ CONSTR PROGR RE
[4]  
Baccarini D., 1999, PROJECT MANAGEMENT J, V30, P25, DOI DOI 10.1177/875697289903000405
[5]  
Belassi W., 1996, INT J PROJ MANAG, V14, P141, DOI DOI 10.1016/0263-7863(95)00064-X
[6]   Baan Mankong: going to scale with "slum" and squatter upgrading in Thailand [J].
Boonyabancha, S .
ENVIRONMENT AND URBANIZATION, 2005, 17 (01) :21-46
[7]   Suitability of procuring large public works by PPP in Hong Kong [J].
Cheung, Esther ;
Chan, Albert ;
Kajewski, Stephen .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2010, 17 (03) :292-+
[8]  
CORBIN J, 2005, RES METHODS SOCIAL S, P49
[9]  
El-Gohary N. M., 2006, International Journal of Project Management, V24, P595, DOI 10.1016/j.ijproman.2006.07.009
[10]   Changing housing policy in Vietnam: Emerging inequalities in a residential area of Hanoi [J].
Gough, Katherine V. ;
Tran, Hoai Anh .
CITIES, 2009, 26 (04) :175-186