Monitoring of over cutting area and lubrication distribution in a large slurry pipe jacking operation

被引:35
作者
Khazaei, Saeid [1 ]
Shimada, Hideki [1 ]
Kawai, Takashi [1 ]
Yotsumoto, Junichi [2 ]
Matsui, Kikuo [1 ]
机构
[1] Kyushu Univ, Dept Earth Resources Engn, Fukuoka 8128581, Japan
[2] Kyowa EXEO Co, Tokyo, Japan
关键词
borehole camera; GPR system; over cutting area; slurry pipe jacking; thrust;
D O I
10.1007/s10706-004-5436-1
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems. Pipe jacking, in its traditional form, has occasionally been used for short railways, roads, rivers, and other projects. Basically the system involves the pushing or thrusting of concrete pipes into the ground by a number of jacks. In slurry pipe jacking, during the pushing process, mud slurry and lubricant are injected into the face and the over cutting area that is between the concrete pipes and the surrounding soil. Next, the slurry fills voids and the soil stabilizes due to the created slurry cake around the pipes. Fillings also reduce the jacking force or thrust during operation. When the drivage and pushing processes are finished, a mortar injection into the over cutting area is carried out in order to maintain permanent stability of the surrounding soil and the over cutting area. Successful lubrication around the pipes is extremely important in a large diameter slurry pipe jacking operation. Control of lubrication and gaps between pipes and soil can prevent hazards such as surface settlement and increases in thrust. Also, to find voids around the pipes after the jacking process, in order to inject mortar for permanent stabilizing, an investigation around the pipes is necessary. To meet these aims, this paper is concerned with the utilization of known methods such as the GPR (Ground Penetrating Radar) system and borehole camera to maintain control of the over cutting area and lubricant distribution around the pipes during a site investigation. From this point of view, experiments were carried out during a tunnel construction using one of the largest cases of slurry pipe jacking in Fujisawa city, Japan. The advantages and disadvantages of each system were clarified during the
引用
收藏
页码:735 / 755
页数:21
相关论文
共 7 条
[1]  
[Anonymous], 2002, HUME PIPE JACKING ME
[2]  
[Anonymous], 2003, FUJ PROJ DAT SLURR P
[3]  
Khazaei S., 2003, INT WORKSH EARTH SCI
[4]  
Kyowa Exeo Co. Ltd, 2003, CONTR OV CUTT AR REI
[5]  
Marshall M., 1998, THESIS OXFORD U ENGL
[6]  
Shimada H., 1998, P REG S SED ROCK ENG, P234
[7]  
Shimada H., 2004, GEOTECH GEOL ENG, V22, P161