共 50 条
- [41] Optimization of underground mining development direction about end slope coal pillar recovery of open-pit coal mine Ding, X.-P. (ccridxp@163.com), 1923, China Coal Society (38):
- [42] Mapping and sampling for real-time development of mine plans in high-grade, narrow-vein, underground mining LIFE WITH ORE DEPOSITS ON EARTH, PROCEEDINGS OF THE 15TH SGA BIENNIAL MEETING, 2019, VOLS 1-4, 2019, : 1501 - 1504
- [43] ADVANCED CONSTRUCTION TECHNOLOGIES FOR THE OHMA NUCLEAR POWER PLANT REACTOR BUILDING OF ELECTRIC POWER DEVELOPMENT CO., LTD PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 325 - +
- [46] The results of research and development works during construction and operation of the mining enterprises at copper-pyrite deposits of 'Uchalinskii' mining enterprise Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 2004, (03): : 41 - 46
- [48] Establishment of High-Precision 3D Datum in Mining Areas - Taking Mine No. 1 of Chinacoal Pingshuo Group Co. Ltd for Example 2018 26TH INTERNATIONAL CONFERENCE ON GEOINFORMATICS (GEOINFORMATICS 2018), 2018,
- [49] A Mining Technology Collaboration Platform Theory and Its Product Development and Application to Support China's Digital Mine Construction APPLIED SCIENCES-BASEL, 2019, 9 (24):
- [50] An Analysis of Internal Control Problem of State-owned Highway Construction Enterprise -Take Huanyu Highway Construction & Development Co., Ltd.as an Example FIRST INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 17 : 314 - 323