共 50 条
- [31] Identity and Work. The identity construction process in subcontracted workers of the Large Copper Mining in Chile IZQUIERDAS, 2024, 53 : 25 - 25
- [32] Environmental and social considerations during abandonment of small scale underground mining operations: Case study of a copper mine MINING ON A SMALL AND MEDIUM SCALE: A GLOBAL PERSPECTIVE, 1997, : 83 - 92
- [34] Development of Seismic Activity Zones in Undermined Rock Mass in Hybrid Opencast/Underground Mining in Kirovsk Mine Journal of Mining Science, 2022, 58 : 966 - 972
- [35] Feasibility of discharging tailing in the open pit of Fengshan copper mine using transforming open-pit into underground mining CIVIL ENGINEERING AND URBAN PLANNING III, 2014, : 191 - 194
- [36] Research on the Mining Methods of the Deep Orebody of No.six pit of Jingning Phosphate Mine of Yunnan Phosphate Chemical Group Co.,LTD PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY, 2016, 37 : 1083 - 1086
- [38] ANALYSIS OF MINING GEOLOGICAL, MINING TECHNICAL CONDITIONS OF PASSING AND DEVELOPMENT OF TECHNOLOGICAL SOLUTIONS FOR EXPLOSIVE PROTECTION OF VERTICAL STEELS OF UNDERGROUND MINE "SUCCESSFUL" AK "ALROSA" MINING OF MINERAL DEPOSITS, 2009, 3 : 329 - 337
- [40] Einsatzmöglichkeiten und Grenzen der Automatisierung im untertägigen Bergbau am Beispiel des Bergbaues Breitenau der Veitsch Radex GmbH & Co.Possibilities and problems with the automation of mining processes in underground mining with examples of the Breitenau Magnesite Mine of Veitsch Radex GmbH & Co. BHM Berg- und Hüttenmännische Monatshefte, 2006, 151 (8) : 320 - 323