共 50 条
- [1] COMPLEX SYSTEM RELIABILITY WITH GENERAL REPAIR TIME DISTRIBUTIONS UNDER PREEMPTIVE RESUME REPAIR DISCIPLINE MICROELECTRONICS AND RELIABILITY, 1973, 12 (04): : 351 - 356
- [2] AVAILABILITY ANALYSIS OF A PART OF RUBBER TUBE PRODUCTION SYSTEM UNDER PREEMPTIVE RESUME PRIORITY REPAIR INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2009, 16 (04): : 260 - 269
- [6] Availability Analysis of Rubber Preparation System a subsystem of a tube manufacturing plant under Preemptive Resume Priority Repair IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 506 - +
- [9] COMPLEX SYSTEM RELIABILITY WITH GENERAL REPAIR TIME DISTRIBUTIONS UNDER PREEMPTIVE REPEAT REPAIR DISCIPLINE MICROELECTRONICS AND RELIABILITY, 1973, 12 (02): : 145 - 150