CNC TURNED PARTS FOR CRUSHERS, SCREENS AND ELEVATORS

被引:0
作者
不详
机构
来源
MACHINE TOOL REVIEW | 1978年 / 66卷 / 382期
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
引用
收藏
页码:38 / 42
页数:5
相关论文
共 50 条
  • [21] MEASURING CONTROLS AND THEIR APPLICATIONS IN PRODUCTION OF TURNED PARTS
    CORBACH, K
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1976, 66 (10): : 587 - 592
  • [22] APPROXIMATE COST ESTIMATES FOR TYPICAL TURNED PARTS
    BOOTHROYD, G
    REYNOLDS, C
    JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (03) : 185 - 193
  • [23] CNC MICROWELDING WITH AUTOMATIC FEEDING OF PARTS
    SCHAFER, J
    F&M-FEINWERKTECHNIK & MESSTECHNIK, 1988, 96 (09): : 381 - 382
  • [24] Picking the parts: Examining the lifetime costs of fabricated parts for vibrating screens
    Processing Equipment Technology, Haver and Boecker Canada, Canada
    Can Min J, 10 (26-27):
  • [25] Considerations regarding improvement of the bearing rings turned on cnc machines inspection
    The National Institute of Research and Development in Mechatronics, Measurement Technique, Romania
    不详
    Rom. Rev. Precis. Mech. Opt. Mechatronics, 46 (11-15):
  • [26] Dynamic planning and multicriteria scheduling of turned parts' production
    Slak, Aleš
    Tavčar, Joze
    Duhovnik, Joze
    Tehnicki Vjesnik, 2010, 17 (04): : 453 - 464
  • [27] ERRORS IN PARTS TURNED ON A FLOATING CENTRE IN HEADSTOCK SPINDLE
    SOLOMENT.YM
    PEISAKHO.IB
    RUSSIAN ENGINEERING JOURNAL-USSR, 1965, 45 (08): : 69 - &
  • [28] STANDARDIZATION AND UNIFICATION OF SPARE PARTS FOR ROLL SCREENS
    BABIN, PP
    KOSKOV, YP
    LYUBARSK.VI
    FLORINSK.NV
    COKE & CHEMISTRY USSR, 1973, (03): : 40 - 41
  • [29] DYNAMIC PLANNING AND MULTICRITERIA SCHEDULING OF TURNED PARTS' PRODUCTION
    Slak, Ales
    Tavcar, Joze
    Duhovnik, Joze
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2010, 17 (04): : 453 - 464
  • [30] FRIENDLY RIVALRY MARKS EURO TURNED PARTS TRIP
    HARTOPP, H
    METALWORKING PRODUCTION, 1979, 123 (07) : 101 - &