ACTION-RESPONSE MODEL AND LOSS OF PRODUCTIVITY IN CONSTRUCTION

被引:64
作者
HALLIGAN, DW
DEMSETZ, LA
BROWN, JD
PACE, CB
机构
[1] O’Brien-Kreitzberg and Assoc., Inc., San Francisco, CA 94105, Bayside Plaza
[2] Dept. of Civ. Engrg., Univ. of California, Berkeley
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1994年 / 120卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(1994)120:1(47)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Unanticipated conditions on a construction project sometimes result in a significant loss of productivity. The conditions that may affect productivity-adverse weather, scheduled overtime, and material shortages, to name a few examples-have received considerable attention in the literature. However, both experience and a detailed examination of this literature reveal that these conditions do not necessarily lead to a loss of productivity. Furthermore, when such losses are observed, their extent varies from project to project, from activity to activity, and from crew to crew. Other factors and processes must therefore be involved. The action-response model of productivity loss in construction identifies these factors and processes. The model graphically depicts how a variety of factors may interact to cause a loss of productivity: how a crew is influenced by these factors and how the management of crews can mitigate, eliminate, initiate, or exacerbate any particular loss of productivity. By applying the model to three case studies, a new approach to evaluating loss of productivity is illustrated.
引用
收藏
页码:47 / 64
页数:18
相关论文
共 43 条
[1]  
Absenteeism and turnover, Rep. C-6, (1982)
[2]  
Borcherding J.D., Alarcon L.F., Quantitative effects on construction productivity, The Constr. Lawyer, 11, 1, pp. 1-48, (1991)
[3]  
Borcherding J.D., Garner D.F., Workforce motivation and productivity on large jobs, J. Constr. Div., ASCE, 107, 3, pp. 443-453, (1981)
[4]  
Borcherding J.D., Oglesby C.H., Construction productivity and job satisfaction, J. Constr. Div., ASCE, 100, 3, pp. 413-431, (1974)
[5]  
Borcherding J.D., Sebastian S.J., Samelson N.M., Improving motivation and productivity on large projects, J. Constr. Div., ASCE, 106, 1, pp. 73-89, (1980)
[6]  
Change orders, Bull. CO-1, (1987)
[7]  
Dallavia L., Estimating Production and Construction Costs, (1954)
[8]  
Doyle M., Management’s role in productivity improvement, Proc., Forum on Constr. Efficiency and Productivity, (1979)
[9]  
The effects of scheduled overtime and shift schedule on construction craft productivity, Source Document 43, (1988)
[10]  
The effect of temperature on productivity, Rep. No. 5072, (1974)