SCHEDULING JOBS WITH RELEASE DATES AND TAILS ON IDENTICAL MACHINES TO MINIMIZE THE MAKESPAN

被引:86
作者
CARLIER, J
机构
[1] Univ Paris VI, Paris, Fr, Univ Paris VI, Paris, Fr
关键词
Compendex;
D O I
10.1016/0377-2217(87)90243-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
INDUSTRIAL PLANTS - Machinery - JOB ANALYSIS
引用
收藏
页码:298 / 306
页数:9
相关论文
共 21 条
[11]  
Jackson J.R., 1955, MANAGEMENT SCI RES P
[12]  
Lageweg B.J., 1976, STAT NEERL, V30, P25
[13]  
MAHON GBM, 1975, OPERATIONS RES, V23, P475
[15]  
Rinnooy Kan AHG, 1976, MACHINE SCHEDULING P
[16]  
SCHONHAGE A, 1976, J COMPUT SYST SCI, V13, P189
[17]  
SCHRAGE L, 1971, UNPUB OBTAINING OPTI
[19]   4 SOLUTION TECHNIQUES FOR A GENERAL ONE MACHINE SCHEDULING PROBLEM - COMPARATIVE-STUDY [J].
VANWASSENHOVE, L ;
GELDERS, L .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1978, 2 (04) :281-290
[20]   PROJECT SCHEDULING WITH CONTINUOUSLY-DIVISIBLE, DOUBLY CONSTRAINED RESOURCES [J].
WEGLARZ, J .
MANAGEMENT SCIENCE, 1981, 27 (09) :1040-1053