SCHEDULING JOBS WITH RELEASE DATES AND TAILS ON IDENTICAL MACHINES TO MINIMIZE THE MAKESPAN

被引:86
作者
CARLIER, J
机构
[1] Univ Paris VI, Paris, Fr, Univ Paris VI, Paris, Fr
关键词
Compendex;
D O I
10.1016/0377-2217(87)90243-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
INDUSTRIAL PLANTS - Machinery - JOB ANALYSIS
引用
收藏
页码:298 / 306
页数:9
相关论文
共 21 条
[1]   SEQUENCING WITH DUE-DATES AND EARLY START TIMES TO MINIMIZE MAXIMUM TARDINESS [J].
BAKER, KR ;
SU, ZS .
NAVAL RESEARCH LOGISTICS, 1974, 21 (01) :171-176
[2]  
BLAZEWICZ J, 1979, INFORMATION PROCESSI, V2, P60
[3]  
BRATLEY P, 1971, NAVAL RES LOGISTICS, V20, P57
[4]   THE ONE-MACHINE SEQUENCING PROBLEM [J].
CARLIER, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1982, 11 (01) :42-47
[5]  
CARLIER J, 1978, RAIRO-RECH OPER, V12, P333
[6]  
Carlier J., 1984, THESIS, P6
[7]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[8]  
Garey Michael R., 1979, COMPUTERS INTRACTABI
[9]   ON FLOWSHOP SCHEDULING WITH RELEASE AND DUE DATES TO MINIMIZE MAXIMUM LATENESS [J].
GRABOWSKI, J ;
SKUBALSKA, E ;
SMUTNICKI, C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (07) :615-620
[10]  
GRABOWSKI J, 1980, OPSEARCH, V17