共 39 条
[1]
BARR R, 1979, CCS350 U TEX CTR CYB
[2]
Barr R. S., 1974, Mathematical Programming, V7, P60, DOI 10.1007/BF01585504
[3]
Berry W., 1975, PRODUCTION INVENTORY, V16, P19
[4]
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[5]
Biggs J. R., 1979, Decision Sciences, V10, P96, DOI 10.1111/j.1540-5915.1979.tb00010.x
[7]
CHARNES A, MANAGEMENT MODELS IN, V2
[8]
CHARNES A, 1961, MANAGEMENT MODELS IN, V1
[9]
DYNAMIC LOT SIZE MODELS FOR MULTI-STAGE ASSEMBLY SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:14-21
[10]
ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 19 (05)
:517-527