共 50 条
[21]
300-MW THORIUM HIGH-TEMPERATURE REACTOR (THTR) READY FOR CONSTRUCTION
[J].
KERNTECHNIK ISOTOPENTECHNIK UND CHEMIE,
1968, 10 (10)
:572-&
[22]
Instructor station of Full Scope Simulator for Qiushan 300 MW Nuclear Power Unit
[J].
Hedongli Gongcheng/Nuclear Power Engineering,
1996, 17 (02)
:129-125
[24]
A Study of the Parameters of the Atmosphere in the Main Building of a Thermal Power Station with 300-MW Power Units
[J].
Thermal Engineering,
1997, 44 (08)
:670-674
[26]
DESIGN OF 420 MW COMBINED UNIT OF POWER-STATION LAUSWARD
[J].
BRENNSTOFF-WARME-KRAFT,
1974, 26 (07)
:319-322
[28]
The in situ repair of the bottom cover of a 300MW pump turbine at Dinorwig power station
[J].
HYDRO POWER DEVELOPMENTS - CURRENT PROJECTS, REHABILITATION, AND POWER RECOVERY,
1997, 97 (04)
:63-71
[30]
The THTR-300 - an opportunity missed?
[J].
ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE,
2002, 47 (02)
:110-+