DESIGN FEATURES OF 300 MW THTR POWER STATION

被引:0
作者
MULLER, HW
机构
来源
JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY | 1969年 / 8卷 / 01期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:20 / &
相关论文
共 50 条
[21]   300-MW THORIUM HIGH-TEMPERATURE REACTOR (THTR) READY FOR CONSTRUCTION [J].
KLIEFOTH, W .
KERNTECHNIK ISOTOPENTECHNIK UND CHEMIE, 1968, 10 (10) :572-&
[22]   Instructor station of Full Scope Simulator for Qiushan 300 MW Nuclear Power Unit [J].
Wu, Fanghui .
Hedongli Gongcheng/Nuclear Power Engineering, 1996, 17 (02) :129-125
[23]   EXPERIENCE GAINED FROM COMMISSIONING 300 MW UNITS AT KASHIRA POWER-STATION [J].
SAMARENK.VA .
THERMAL ENGINEERING, 1972, 18 (06) :38-&
[24]   A Study of the Parameters of the Atmosphere in the Main Building of a Thermal Power Station with 300-MW Power Units [J].
Skubienko, S.V. ;
Madoyan, A.A. ;
Borisov, G.M. .
Thermal Engineering, 1997, 44 (08) :670-674
[25]   WARMING UP AT THTR-300 [J].
不详 .
NUCLEAR ENGINEERING INTERNATIONAL, 1985, 30 (371) :40-41
[26]   DESIGN OF 420 MW COMBINED UNIT OF POWER-STATION LAUSWARD [J].
MARNET, C ;
KASSEBOHM, B .
BRENNSTOFF-WARME-KRAFT, 1974, 26 (07) :319-322
[27]   THTR-300 safely enclosed [J].
不详 .
NUCLEAR ENGINEERING INTERNATIONAL, 1997, 42 (516) :38-38
[28]   The in situ repair of the bottom cover of a 300MW pump turbine at Dinorwig power station [J].
Moss, WO ;
Jones, G .
HYDRO POWER DEVELOPMENTS - CURRENT PROJECTS, REHABILITATION, AND POWER RECOVERY, 1997, 97 (04) :63-71
[29]   RESULTS OF COMPREHENSIVE IMPROVEMENT OF 300 MW GENERATING UNITS AT KARMANOVO-CENTRAL-POWER-STATION [J].
ABDURASHITOV, SR ;
FILATEVA, IA ;
GAVRILOV, AF ;
ZEGER, KE ;
EFIMOCHKIN, GI ;
KHAKIMOV, AG ;
KROKHALEV, BM .
THERMAL ENGINEERING, 1976, 23 (04) :6-9
[30]   The THTR-300 - an opportunity missed? [J].
Knizia, K .
ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 2002, 47 (02) :110-+