SEQUENCING INDEPENDENT JOBS WITH A SINGLE RESOURCE

被引:17
作者
BAKER, KR
NUTTLE, HLW
机构
[1] DARTMOUTH COLL, HANOVER, NH 03755 USA
[2] N CAROLINA STATE UNIV, RALEIGH, NC 27607 USA
关键词
Compendex;
D O I
10.1002/nav.3800270313
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
PRODUCTION ENGINEERING
引用
收藏
页码:499 / 510
页数:12
相关论文
共 15 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
BURNS RN, 1975, SINGLE MACHINE SEQUE
[3]   ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS [J].
EMMONS, H .
OPERATIONS RESEARCH, 1969, 17 (04) :701-&
[4]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[5]   NOTE ON A SCHEDULING PROBLEM WITH DUAL CRITERIA [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :615-616
[6]   COORDINATING AGGREGATE AND DETAILED SCHEDULING IN ONE-MACHINE JOB SHOP .2. COMPUTATION AND STRUCTURE [J].
GELDERS, L ;
KLEINDORFER, PR .
OPERATIONS RESEARCH, 1975, 23 (02) :312-324
[7]   COORDINATING AGGREGATE AND DETAILED SCHEDULING DECISIONS IN ONE-MACHINE JOB SHOP .1. THEORY [J].
GELDERS, L ;
KLEINDORFER, PR .
OPERATIONS RESEARCH, 1974, 22 (01) :46-60
[8]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[9]  
Lawler E. L., 1977, ANN DISCRETE MATH, V1, P331, DOI [10.1016/S0167-5060(08)70742-8, DOI 10.1016/S0167-5060(08)70742-8]
[10]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288