A REAL-TIME APPROACH TO MANAGEMENT AND MONITORING OF GROUNDWATER HYDRAULICS

被引:28
作者
ANDRICEVIC, R
机构
关键词
D O I
10.1029/WR026i011p02747
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper describes a sequential approach to the management and monitoring program of groundwater hydraulics. The management model, structured as a discrete time optimal control problem, identifies the optimal withdrawal rates by satisfying a penalty type cost function of two conflicting objectives: satisfying withdrawal demands and maintaining target hydraulic head levels. A control action obtained in the feedback form is shown in this study to depend on future uncertainty in the hydraulic head prediction due to the variability in the hydraulic conductivity. As new field observations become available the hydraulic conductivity field is updated in “real‐time.” A numerical example demonstrates the sequential approach and quantifies the benefits of using the monitoring program. The effects of the objective function uncertainty upon the optimal management solution is discussed; a simple case illustrating an optimization bias appearance is presented. Copyright 1990 by the American Geophysical Union.
引用
收藏
页码:2747 / 2755
页数:9
相关论文
共 30 条
[1]   COST-EFFECTIVE NETWORK DESIGN FOR GROUNDWATER-FLOW MONITORING [J].
ANDRICEVIC, R .
STOCHASTIC HYDROLOGY AND HYDRAULICS, 1990, 4 (01) :27-41
[2]   OPTIMIZATION OF THE PUMPING SCHEDULE IN AQUIFER REMEDIATION UNDER UNCERTAINTY [J].
ANDRICEVIC, R ;
KITANIDIS, PK .
WATER RESOURCES RESEARCH, 1990, 26 (05) :875-885
[3]  
Benjamin J. R., 1970, PROBABILITY STATISTI
[4]   OPTIMAL-CONTROL MODEL FOR GROUNDWATER-MANAGEMENT [J].
CASOLA, WH ;
NARAYANAN, R ;
DUFFY, C ;
BISHOP, AB .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1986, 112 (02) :183-197
[5]   STATISTICAL-INFERENCE OF SPATIAL RANDOM FUNCTIONS [J].
FEINERMAN, E ;
DAGAN, G ;
BRESLER, E .
WATER RESOURCES RESEARCH, 1986, 22 (06) :935-942
[6]   AQUIFER RECLAMATION DESIGN - THE USE OF CONTAMINANT TRANSPORT SIMULATION COMBINED WITH NONLINEAR-PROGRAMMING [J].
GORELICK, SM ;
VOSS, CI ;
GILL, PE ;
MURRAY, W ;
SAUNDERS, MA ;
WRIGHT, MH .
WATER RESOURCES RESEARCH, 1984, 20 (04) :415-427
[7]   OPTIMAL DYNAMIC MANAGEMENT OF GROUNDWATER POLLUTANT SOURCES [J].
GORELICK, SM ;
REMSON, I .
WATER RESOURCES RESEARCH, 1982, 18 (01) :71-76
[8]   A REVIEW OF DISTRIBUTED PARAMETER GROUNDWATER-MANAGEMENT MODELING METHODS [J].
GORELICK, SM .
WATER RESOURCES RESEARCH, 1983, 19 (02) :305-319
[9]   STOCHASTIC-ANALYSIS OF NONSTATIONARY SUBSURFACE SOLUTE TRANSPORT .2. CONDITIONAL MOMENTS [J].
GRAHAM, W ;
MCLAUGHLIN, D .
WATER RESOURCES RESEARCH, 1989, 25 (11) :2331-2355
[10]   IS OPTIMIZATION OPTIMISTICALLY BIASED [J].
HOBBS, BF ;
HEPENSTAL, A .
WATER RESOURCES RESEARCH, 1989, 25 (02) :152-160