共 50 条
[42]
Technology Development and Efficiency Assessment for Waste Utilization in Pig-Iron Production
[J].
Metallurgist,
2014, 58
:482-487
[43]
MEASURES TO REDUCE THE ENERGY-CONSUMPTION DURING PRODUCTION OF PIG-IRON IN THE FEDERAL-REPUBLIC-OF-GERMANY
[J].
STAHL UND EISEN,
1985, 105 (22)
:I14-&
[44]
KR-PROCESS MEANS PIG-IRON PRODUCTION ON THE BASIS OF COAL
[J].
CIM BULLETIN,
1984, 77 (866)
:64-64
[45]
EFFECTIVENESS OF SEPARATION OF PIG-IRON AND SLAG
[J].
STEEL IN THE USSR,
1986, 16 (07)
:317-319
[48]
CONCEPT OF A NEW METHOD FOR THE PIG-IRON MAKING WITH REDUCED ENERGY DEMAND
[J].
NEUE HUTTE,
1985, 30 (05)
:180-183
[49]
BUBBLE FORMATION AT NOZZLES IN PIG-IRON
[J].
METALLURGICAL TRANSACTIONS B-PROCESS METALLURGY,
1978, 9 (01)
:101-110