共 14 条
- [1] CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
- [2] Conway RW., 1967, THEORY SCHEDULING
- [3] Ham I., 1985, GROUP TECHNOLOGY
- [4] Johnson S.M., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
- [5] Kan A. R., 2012, MACHINE SCHEDULING P, DOI DOI 10.1016/0377-2217(77)90029-7
- [6] KURISU T, 1976, J OPER RES SOC JPN, V19, P1
- [8] SEQUENCING N-JOBS ON 2 MACHINES WITH ARBITRARY TIME LAGS [J]. MANAGEMENT SCIENCE, 1959, 5 (03) : 293 - 298