CYCLIC SCHEDULING VIA INTEGER PROGRAMS WITH CIRCULAR ONES

被引:102
作者
BARTHOLDI, JJ
ORLIN, JB
RATLIFF, HD
机构
[1] MIT,CAMBRIDGE,MA 02139
[2] GEORGIA INST TECHNOL,ATLANTA,GA 30332
关键词
D O I
10.1287/opre.28.5.1074
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1074 / 1085
页数:12
相关论文
共 16 条
[1]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[2]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[3]   UNNETWORKS, WITH APPLICATIONS TO IDLE TIME SCHEDULING [J].
BARTHOLDI, JJ ;
RATLIFF, HD .
MANAGEMENT SCIENCE, 1978, 24 (08) :850-858
[4]   SCHEDULING OF WORK FORCES REQUIRED IN CONTINUOUS OPERATIONS UNDER ALTERNATIVE LABOR POLICIES [J].
BROWNELL, WS ;
LOWERRE, JM .
MANAGEMENT SCIENCE, 1976, 22 (05) :597-605
[5]  
CHEN DS, 1976, ORSA TIMS JOINT NATI
[6]  
Dantzig G., 1951, ACTIVITY ANAL PRODUC, P339
[7]   THEORETICAL IMPROVEMENTS IN ALGORITHMIC EFFICIENCY FOR NETWORK FLOW PROBLEMS [J].
EDMONDS, J ;
KARP, RM .
JOURNAL OF THE ACM, 1972, 19 (02) :248-&
[8]   INCIDENCE MATRICES AND INTERVAL GRAPHS [J].
FULKERSON, DR ;
GROSS, OA .
PACIFIC JOURNAL OF MATHEMATICS, 1965, 15 (03) :835-+
[9]  
GADDUM JW, 1954, NAVAL RES LOG Q, V1, P223
[10]  
GROSS OA, 1955, D3129 PROJ RAND DOC