共 50 条
- [41] AUTOMATIC SUBMERGED-ARC SPOT WELDING OF T JOINTS BETWEEN RODS AND PLATES AUTOMATIC WELDING USSR, 1976, 29 (07): : 46 - 46
- [42] AUTOMATIC SUBMERGED-ARC WELDING OF BUTT JOINTS IN CLAD STEEL WITH AN INCREASED GAP AUTOMATIC WELDING USSR, 1974, 27 (10): : 68 - 69
- [43] THE LATERAL SHRINKAGE OF BUTT-WELDED JOINTS IN AUTOMATIC SUBMERGED-ARC WELDING AUTOMATIC WELDING USSR, 1980, 33 (03): : 5 - 8
- [44] DETERMINATION OF VOLTAGE DROP IN STICKOUT OF ELECTRODE WIRE IN AUTOMATIC SUBMERGED-ARC WELDING WELDING PRODUCTION, 1976, 23 (10): : 51 - 53
- [45] MODELING A SYSTEM FOR CALCULATING WELDING CONDITIONS FOR 2-SIDE AUTOMATIC SUBMERGED-ARC WELDING AUTOMATIC WELDING USSR, 1977, 30 (06): : 10 - 12
- [46] SOME CONDITIONS OF ARCING IN THE DEPTH OF A METAL POOL DURING SEMI-AUTOMATIC SUBMERGED-ARC WELDING. Welding Production (English translation of Svarochnoe Proizvodstvo), 1976, 23 (01): : 82 - 84
- [47] EFFECT OF SILICON CONTENT ON THE DUCTILITY OF WELD METAL IN SUBMERGED-ARC WELDING. Welding Production (English translation of Svarochnoe Proizvodstvo), 1981, 28 (01): : 7 - 9
- [48] SLAG METAL REACTIONS DURING SUBMERGED-ARC WELDING OF ALLOY-STEELS METALLURGICAL TRANSACTIONS A-PHYSICAL METALLURGY AND MATERIALS SCIENCE, 1984, 15 (01): : 217 - 227