ESTIMATING MOTORIST DELAY AT 2-LANE HIGHWAY WORK ZONES

被引:11
作者
CASSIDY, MJ
SON, YT
ROSOWSKY, DV
机构
[1] Purdue University, School of Civil Engineering, West Lafayette
关键词
D O I
10.1016/0965-8564(94)90025-6
中图分类号
F [经济];
学科分类号
02 ;
摘要
Maintenance or construction activity on a two-lane highway often requires a lane closure. As these conditions dictate that vehicles in both directions of travel utilize the highway's single remaining lane, significant motorist delay typically results. This paper presents a queueing-based approach for estimating the average delay imposed on vehicles in each operating cycle. To accommodate the stochastic nature of work zone operations, the research has exploited standard methods such as Monte-Carlo simulation and approximate analysis techniques to formulate models for predicting percentile values of average cyclic delay. Comparison of average delay values estimated using the formulated ''approximate techniques'' with those generated through Monte-Carlo and microscopic simulation suggests that the proposed method is a reasonable means for estimating work zone impacts.
引用
收藏
页码:433 / 444
页数:12
相关论文
共 9 条
[1]  
Ang AH-S, 1975, PROBABILITY CONCEPTS
[2]  
Benjamin J. R., 1970, PROBABILITY STATISTI
[3]  
*CA DEP TRANSP, 1978, ON WAY TRAFF CONTR C
[4]   PROPOSED MODEL FOR PREDICTING MOTORIST DELAYS AT 2-LANE HIGHWAY WORK ZONES [J].
CASSIDY, MJ ;
HAN, LD .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1993, 119 (01) :27-42
[5]  
CEDER A, 1990, 11TH P INT S TRANSP
[6]  
HOGG RV, 1988, PROBABILITY STATISTI
[7]  
SON YT, 1993, UNPUB ASCE J TRANSPO
[8]  
WEBSTER FV, 1966, 56 ROAD RES LAB TECH
[9]  
WEBSTER FV, 1958, 39 ROAD RES LAB TECH