Qualitative Techniques for Project Management. III.b. Critical Chain - Modern Technique for

被引:0
|
作者
Deac, Vasile [1 ]
Vrincut, Mihai [1 ]
Branzas, Beniamin [1 ]
机构
[1] Acad Econ Studies, Management Dept, Bucharest, Romania
来源
QUALITY-ACCESS TO SUCCESS | 2012年 / 13卷 / 131期
关键词
critical chain project management; task time reserves; planning scenarios; resource leveling;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The present article explores in detail the Critical Chain planning method and the way it affects the total duration of a project. Accurate estimation of tasks duration is one of the main prerequisites for an efficient project implementation. Another condition concerns the availability of resources, in terms of removing conflicts between concurrent tasks and limited resources. Similar to the Critical Path, Critical Chain is dealing with time reserves, but these time reserves are handled in a different manner. To "protect" the project delivery date, it is common to reschedule the start of a task earlier, this being facilitated by the elimination of unnecessary time reserves. Planning tasks is executed in a different way, in order to reduce the number of tasks that start at the same time. Apparently, the project duration will expand, by providing a time reserve for the end of the project, but eliminating inefficient multitasking ensures a substantial economy of time, safe from common time-wasting phenomena that occur in the Critical Path method.
引用
收藏
页码:82 / 85
页数:4
相关论文
共 50 条