STREETWALKERS DILEMMA - JOB SHOP MODEL

被引:34
作者
LIPPMAN, SA
ROSS, SM
机构
关键词
D O I
10.1137/0120036
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Authors consider the problem of maximizing the long-run average return in a single server traffic reward system in which the customer's offer, a joint distribution of reward and of service time required to earn this reward, is independent of the renewal process which governs customer arrivals. After formulating the problem as a semi-Markov decision process, authors characterize the form of an optimal policy. When the renewal process is Poisson, the characterization is easily stated-accept a customer if and only if the raio of his expected reward to his expected service time is larger than g, the long-run average return. when the arrival process is Poisson, g is easily found. Next, batch arrivals are permitted, and further results are obtained.
引用
收藏
页码:336 / &
相关论文
共 50 条
[31]   A MILP model for an extended version of the Flexible Job Shop Problem [J].
Birgin, Ernesto G. ;
Feofiloff, Paulo ;
Fernandes, Cristina G. ;
de Melo, Everton L. ;
Oshiro, Marcio T. I. ;
Ronconi, Debora P. .
OPTIMIZATION LETTERS, 2014, 8 (04) :1417-1431
[32]   A MILP model for an extended version of the Flexible Job Shop Problem [J].
Ernesto G. Birgin ;
Paulo Feofiloff ;
Cristina G. Fernandes ;
Everton L. de Melo ;
Marcio T. I. Oshiro ;
Débora P. Ronconi .
Optimization Letters, 2014, 8 :1417-1431
[33]   An introduction to Job Shop Scheduling to model the Timetabling Scheduling Problem [J].
Fuentes-Penna, Alejandro ;
Gomez-Espinosa, Lilibeth C. ;
Pasten Borja, Alejandro Perez .
INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2022, 13 (03) :63-74
[34]   VaR-based job shop scheduling model and algorithm [J].
Yu, Ying ;
Wang, Chengwei ;
Zhu, Ji .
AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 :386-389
[35]   Robust Model for Job Shop Scheduling with Uncertain Processing Times [J].
Wang, Bing ;
Yang, Xiaofei .
CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, :2484-2489
[36]   Model and solution of job-shop scheduling for parallel processes [J].
Liu, Xiaoping ;
Xu, Benzhu ;
Peng, Jun ;
Shen, Guanting .
Jisuanji Fuzhu Sheji Yu Tuxingxue Xuebao/Journal of Computer-Aided Design and Computer Graphics, 2012, 24 (01) :120-127
[37]   A memetic approach to fuzzy job shop based on expectation model [J].
Gonzalez-Rodriguez, Ines ;
Vela, Camino R. ;
Puente, Jorge .
2007 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-4, 2007, :691-+
[38]   A multi-agent model for reactive job shop scheduling [J].
Liu, N ;
Abdelrahman, MA ;
Ramaswamy, S .
PROCEEDINGS OF THE THIRTY-SIXTH SOUTHEASTERN SYMPOSIUM ON SYSTEM THEORY, 2004, :241-245
[39]   A Multi-agent Model for Job-Shop Scheduling [J].
Neagu, Gabriel .
SERVICE ORIENTATION IN HOLONIC AND MULTI-AGENT MANUFACTURING CONTROL, 2012, 402 :211-225
[40]   Job-shop scheduling model and algorithm with machine deterioration [J].
Huang, Min ;
Fu, Ya-Ping ;
Wang, Hong-Feng ;
Zhu, Bing-Hu ;
Wang, Xing-Wei .
Zidonghua Xuebao/Acta Automatica Sinica, 2015, 41 (03) :551-558