Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: A Delphi approach

被引:68
作者
Perera, B. A. K. S. [1 ]
Rameezdeen, Raufdeen [2 ]
Chileshe, Nicholas [2 ]
Hosseini, M. Reza [2 ]
机构
[1] Univ Moratuwa, Dept Bldg Econ, Moratuwa, Sri Lanka
[2] Univ South Australia, Sch Nat & Built Environm, City East Campus, Adelaide, SA 5001, Australia
关键词
risk management; construction industry; Delphi study; road projects; Sri Lanka;
D O I
10.1080/15623599.2013.875271
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The purpose of this study was twofold: (1) Identifying the risks that are critical for risk management of road construction projects in Sri Lanka on a life cycle basis and (2) defining the shares of the parties involved in projects in terms of handling the identified risks. A Delphi study was conducted among 33 Sri Lankan experts (consultants, project managers, contractors) in three rounds. The findings showed that the construction and design phases are prone to many major risks. Moreover, 'delays in payment by the client' was the most critical risk factor in the construction stage. Furthermore, it was established that some major risks could occur in more than one phase of the project life cycle, stressing the necessity of handling these risk factors as a prerequisite for project success. The discussions presented in this study would enhance the effectiveness of implementing risk management practices in Sri Lankan road construction projects. From a broader vantage point, it will also serve the risk management body of knowledge in the construction industry.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 91 条
  • [21] Delbecq Andre L., 1975, GROUP TECHNIQUES PRO
  • [22] Dey P.K., 2002, COST ENG, V44, P13
  • [23] Learning from risks: A tool for post-project risk assessment
    Dikmen, I.
    Birgonul, M. T.
    Anac, C.
    Tah, J. H. M.
    Aouad, G.
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 18 (01) : 42 - 50
  • [24] Profiling work motivation of project workers
    Dwivedula, Ravikiran
    Bredillet, Christophe N.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (02) : 158 - 165
  • [25] El-Sayegh Sameh Monir, 2008, International Journal of Project Management, V26, P431, DOI 10.1016/j.ijproman.2007.07.004
  • [26] Choosing a project risk-handling strategy: An analytical model
    Fan, Miao
    Lin, Neng-Pal
    Sheu, Chwen
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 700 - 713
  • [27] Risks in Chinese construction market - Contractors' perspective
    Fang, DP
    Li, MG
    Fong, PSW
    Shen, LY
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (06) : 853 - 861
  • [28] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116
  • [29] Goh CS, 2013, J CONSTR DEV CTRIES, V18, P19
  • [30] MOTIVATION THROUGH DESIGN OF WORK - TEST OF A THEORY
    HACKMAN, JR
    OLDHAM, GR
    [J]. ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1976, 16 (02): : 250 - 279