HEAVY CONSTRUCTION ESTIMATES, WITH AND WITHOUT COMPUTERS - DISCUSSION

被引:0
作者
HEGAZY, T
机构
[1] Ctr. for Bldg. Studies, Concordia Univ., Montreal, QC
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1993年 / 119卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:4(860)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
[No abstract available]
引用
收藏
页码:860 / 862
页数:3
相关论文
共 3 条
  • [1] Carr R., Cost-estimating principles, J. Constr. Engrg. and Mgmt, 115, 4, pp. 545-551, (1989)
  • [2] Moselhi O., Hegazy T., Fazio P., A hybrid neural network methodology for cost estimation, Proc. 8th Int. Symp. on Automation and Robotics in Constr., Frauhofer Institute for Manufacturing Engineering and Automation, 2, pp. 519-528, (1991)
  • [3] Moselhi O., Hegazy T., Fazio P., Practical cost estimating in a competitive environment, Trans. AACE 35th Annual Meeting, (1991)