A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES

被引:51
作者
BAKER, KR
JIA, D
机构
[1] The Amos Tuck School of Business Administration, Dartmouth College
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1993年 / 21卷 / 05期
关键词
PREDICTION SCHEDULING; BATCH PRODUCTION; FLOWSHOP; MATERIALS HANDLING; SHOP;
D O I
10.1016/0305-0483(93)90024-F
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We describe computational experiments with several algorithms for solving the lot streaming problem. Each of the algorithms optimizes the makespan under some set of constraints. For example, we can constrain the solution to have no idling, consistent sublots, equal sublots or equal sublots and no idling. Such constraints increase the makespan substantially over what is optimally possible, or they may have no impact at all. Our computational results for the three-machine problem provide a quantification of these relationships.
引用
收藏
页码:561 / 566
页数:6
相关论文
共 12 条
[1]  
BAKER KR, 1988, 203 DARTM COLL A TUC
[2]  
BAKER KR, 1993, ELEMENTS SEQUENCING
[3]  
GLASS CA, 1992, 23RD P ANN M DEC SCI
[4]  
Goldratt E.M., 1986, RACE, V1st
[5]   FLOW-SHOP SCHEDULING WITH LOT STREAMING [J].
POTTS, CN ;
BAKER, KR .
OPERATIONS RESEARCH LETTERS, 1989, 8 (06) :297-303
[6]  
POTTS CN, 1992, J OPERATIONAL RES SO, V48, P395
[7]  
Reiter S., 1966, J BUS, V34, P371
[8]   MANUFACTURING CYCLE TIME DETERMINATION FOR A MULTISTAGE ECONOMIC PRODUCTION QUANTITY MODEL [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1975, 22 (03) :298-308
[9]  
TRIETSCH D, 1993, IN PRESS OPS RES, V41
[10]  
TRIETSCH D, 1989, NPS5489011 NAV POSTG