TRANSIENT PERFORMANCE AND CONTROL OF HYDRAULIC TURBINE-GENERATOR UNITS

被引:1
作者
RAMAMURTHI, V
RAMACHANDRAM, K
KODANDARAMASWAMY, PS
机构
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1981年 / 100卷 / 01期
关键词
D O I
10.1109/TPAS.1981.316841
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:288 / 294
页数:7
相关论文
共 50 条
[41]   Installation of an integrated turbine-generator control system for a pulp mill [J].
Weaver, M ;
Hilder, S ;
Brown, DR .
IAS 2000 - CONFERENCE RECORD OF THE 2000 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-5, 2000, :3468-3475
[42]   EFFECTS OF NEW INTERNATIONAL FORMULATION ON TURBINE-GENERATOR PERFORMANCE CALCULATIONS [J].
COTTON, KC ;
DEMING, NR ;
GARBINSK.EH .
JOURNAL OF ENGINEERING FOR POWER, 1968, 90 (01) :15-&
[43]   EFFECT OF HVDC LINE FAULTS ON TRANSIENT TORSIONAL TORQUES OF TURBINE-GENERATOR SHAFTS [J].
SHI, W ;
IRAVANI, MR .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (03) :1457-1464
[44]   IMPORTANT PARAMETERS IN CONSIDERING TRANSIENT TORQUES ON TURBINE-GENERATOR SHAFT SYSTEMS. [J].
Ramey, D.G. ;
Sismour, A.C. ;
Kung, G.C. .
1979,
[45]   DYNAMIC ANALYSIS OF TURBINE-GENERATOR FOUNDATIONS [J].
ABOULELLA, F ;
NOVAK, M .
JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1983, 80 (01) :56-56
[46]   Managing turbine-generator outages by computer [J].
Reinhart, ER .
MECHANICAL ENGINEERING, 1997, 119 (09) :84-87
[47]   How to save on turbine-generator overhauls [J].
Barker, T .
TURBOMACHINERY INTERNATIONAL, 2003, 44 (05) :30-30
[48]   UK TURBINE-GENERATOR AND BOILER INDUSTRY [J].
LEWINS, J .
JOURNAL OF THE INSTITUTION OF NUCLEAR ENGINEERS, 1977, 18 (01) :3-&
[49]   REASSESSMENT OF TURBINE-GENERATOR FAILURE PROBABILITY [J].
BUSH, SH .
NUCLEAR SAFETY, 1978, 19 (06) :681-698
[50]   WHY HELP TURBINE-GENERATOR MANUFACTURERS [J].
MASTERS, R .
ELECTRICAL REVIEW, 1976, 198 (01) :12-13