共 50 条
- [47] LOWER BOUND SOLUTIONS TO MULTISTAGE PRODUCTION SCHEDULING PROBLEMS WITH STARTUP DELAYS AIIE TRANSACTIONS, 1979, 11 (04): : 313 - 318
- [48] Interpreting the Inventory of Interpersonal Problems: A rejoinder to Riding and Cartwright - A reply to Startup BRITISH JOURNAL OF MEDICAL PSYCHOLOGY, 2000, 73 : 559 - 560
- [49] MADAWASKA-MINES - LEAVING STARTUP AND CONTRACT PROBLEMS FAR BEHIND E&MJ-ENGINEERING AND MINING JOURNAL, 1978, 179 (11): : 162 - 165
- [50] STARTUP PROBLEMS WITH NEW HOISTING EQUIPMENT AT DOME-MINES-LTD CIM BULLETIN, 1985, 78 (879): : 32 - 32