Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

被引:41
作者
Chelbi, Anis [1 ]
Rezg, Nidhal [2 ]
Radhoui, Mehdi [2 ]
机构
[1] CEREP, Tunis, Tunisia
[2] LGIPM, Metz, France
关键词
Lot size; Preventive maintenance; Quality; Inventory;
D O I
10.1108/13552510810877665
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items. Design/methodology/approach - The proposed integrated policy is defined and modeled mathematically. Findings - The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications - The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality-and inventory-related costs is shown through a numerical example. Originality/value - The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory-and quality-related costs.
引用
收藏
页码:161 / +
页数:17
相关论文
共 14 条
[1]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[2]   Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance [J].
Chelbi, A ;
Alt-Kadi, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :712-718
[3]  
Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO
[4]  
2-7
[5]  
Dallery Y., 1992, Queueing Systems Theory and Applications, V12, P3, DOI 10.1007/BF01158636
[6]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[7]  
Jaber Y., 1996, APPL MATH MODEL, V21, P85
[8]  
Peterson R, 1998, INVENTORY MANAGEMENT, V3
[9]  
Porteus E. L., 1985, NAV RES LOG, V33, P39
[10]   Joint optimization of preventive maintenance and inventory control in a production line using simulation [J].
Rezg, N ;
Xie, X ;
Mati, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (10) :2029-2046