OPTIMAL HYDROTHERMAL SCHEDULING WITH CASCADED PLANTS USING PROGRESSIVE OPTIMALITY ALGORITHM

被引:29
作者
NANDA, J
BIJWE, PR
机构
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1981年 / 100卷 / 04期
关键词
D O I
10.1109/TPAS.1981.316486
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:2093 / 2099
页数:7
相关论文
共 10 条
[1]  
BERNHOLTZ B, 1960, AIEE T 3, V79, P921
[2]  
BIJWE PR, 1977, SUM IEEE PES M
[3]   OPTIMAL SCHEDULING OF HYDRO-THERMAL POWER-SYSTEMS [J].
BONAERT, AP ;
ELABIAD, AH ;
KOIVO, AJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (01) :263-&
[4]   OPTIMAL SOLUTION TO HYDRO-STEAM DISPATCH PROBLEM FOR CERTAIN PRACTICAL SYSTEMS [J].
DAHLIN, EB ;
SHEN, DWC .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1966, PA85 (05) :437-+
[5]  
DRAKE HH, 1962, AIEE T PAS, V81, P242
[6]   NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS [J].
HOWSON, HR ;
SANCHO, NGF .
MATHEMATICAL PROGRAMMING, 1975, 8 (01) :104-116
[7]  
NAGRATH IJ, 1976, J IE ELECTRICAL, V56
[8]  
RAO KSP, 1974, THESIS IIT KANPUR
[9]  
RAO KSP, 1974, WIN IEEE PES M
[10]   NEW APPROACH TO MODIFIED COORDINATION EQUATIONS FOR ECONOMIC LOAD DISPATCH [J].
WADHWA, CL ;
NANDA, J .
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1976, 123 (09) :923-925