Risk allocation in public-private partnership water supply projects in Ghana

被引:71
作者
Ameyaw, Effah Ernest [1 ]
Chan, Albert P. C. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
关键词
Fuzzy set theory; risk allocation; water supply; public-private partnership;
D O I
10.1080/01446193.2015.1031148
中图分类号
F [经济];
学科分类号
02 ;
摘要
Appropriate risk allocation (RA) between public and private sectors according to their risk management (RM) capabilities is crucial for the success of public-private partnership (PPP) projects. The RA process in PPP water projects is examined, and a methodology based on fuzzy set theory is outlined with RA principles that can be used by public-private participants to arrive at fair RA decisions. Empirical data based on an industry-wide three-round Delphi questionnaire survey is used in this study to outline the methodology. The fuzzy set theory is employed for the RA analysis because it deals well with the complex multi-criteria problem of, and precisely accounts for the fuzziness inherent in human cognitive process that characterize, RA decision-making. Five risk factors are evaluated on each RA principle, analysed and assigned between the public and private sectors. The results show that it is appropriate to allocate risks according to both sectors' RM capability to manage them, using established RA principles and fuzzy set theory. The methodology renders the decision-making process more systematic and practical because the fuzzy theory approach allows decision makers to express their evaluations of both sectors' RM capabilities in descriptive qualitative terms. The results should assist public clients to establish efficient RA strategies and develop balanced RA schemes for PPP contracts, with a view to achieving a mutually acceptable RA with the private sector.
引用
收藏
页码:187 / 208
页数:22
相关论文
共 99 条
[1]  
Abednego M. P., 2006, International Journal of Project Management, V24, P622, DOI 10.1016/j.ijproman.2006.07.010
[2]  
Ameyaw E. E., 2014, THESIS
[3]   A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects [J].
Ameyaw, Ernest ;
Chan, Albert ;
Owusu-Manu, De-Graft ;
Coleman, Ekow .
JOURNAL OF FACILITIES MANAGEMENT, 2015, 13 (01) :45-+
[4]   Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (02) :152-+
[5]  
Arndt R. H, 2000, THESIS
[6]   Capture and corruption in public utilities: The cases of water and electricity in Sub-Saharan Africa [J].
Auriol, Emmanuelle ;
Blanc, Aymeric .
UTILITIES POLICY, 2009, 17 (02) :203-216
[7]  
Barnett C., 2007, MIRAGE FLORIDA VANIS
[8]  
Bennett A, 2011, FILTR SEPARAT, V48, P24
[9]  
Blanc A., 2006, 25 AG FRANC DEV
[10]  
Boakye E., 2010, EUROPEAN J SCI RES, V46, P119