共 6 条
[1]
CHAND S, 1979, THESIS CARNEGIE MELL
[2]
DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1971, 18 (01)
:12-20
[3]
LOVE S, 1973, MGMT SCI, V21, P313
[5]
MORTON T, 1978, WP597778 CARN MELL U
[6]
DETERMINISTIC MULTI-PERIOD PRODUCTION PLANNING MODEL WITH PIECEWISE CONCAVE PRODUCTION AND HOLDING-BACKORDER COSTS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1975, 21 (09)
:1007-1013