共 34 条
[1]
[Anonymous], 2016, LINEAR NONLINEAR PRO
[2]
Baker K., 1974, INTRO SEQUENCING SCH
[3]
Bertsekas D.P., 1987, ABSTRACT DYNAMIC PRO
[6]
HYBRID HIERARCHICAL SCHEDULING AND CONTROL-SYSTEMS IN MANUFACTURING
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1990, 6 (06)
:673-686
[9]
FRENCH S, 1982, SEQUENCING SCHEDULIN
[10]
CONTROL PERSPECTIVE ON RECENT TRENDS IN MANUFACTURING SYSTEMS.
[J].
IEEE Control Systems Magazine,
1986, 6 (02)
:3-15