SCHEDULING FLEXIBLE FLOW SHOPS WITH NO SETUP EFFECTS

被引:25
作者
CHANG, SC
LIAO, DY
机构
[1] Department of Electrical Engineering, National Taiwan University, Taipei
来源
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 1994年 / 10卷 / 02期
关键词
D O I
10.1109/70.282536
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents an efficient, optimization model-based approach for scheduling the production of discrete-part, make-to-order type of flexible flow shops, where setup effects are negligible. A nominal scheduling algorithm based on Lagrangian relaxation and minimum cost linear network flow is first developed for scheduling under nominal conditions. Fast rescheduling algorithms that exploit the economic interpretation of the Lagrange multipliers and the network structure of production flows are then proposed for timely adjusting the nominal schedule to cope with disturbances. Numerical results on realistic examples demonstrate that our methodology is quite effective; it generates near-optimal schedules, provides relatively smooth adjustment (i.e., no drastic change from the nominal schedule) for small disturbances, and is computationally efficient.
引用
收藏
页码:112 / 122
页数:11
相关论文
共 34 条
[1]  
[Anonymous], 2016, LINEAR NONLINEAR PRO
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]  
Bertsekas D.P., 1987, ABSTRACT DYNAMIC PRO
[4]   RELAXATION METHODS FOR MINIMUM COST ORDINARY AND GENERALIZED NETWORK FLOW PROBLEMS [J].
BERTSEKAS, DP ;
TSENG, P .
OPERATIONS RESEARCH, 1988, 36 (01) :93-114
[5]   NEW TRENDS IN MACHINE SCHEDULING [J].
BLAZEWICZ, J ;
FINKE, G ;
HAUPT, R ;
SCHMIDT, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :303-317
[6]   HYBRID HIERARCHICAL SCHEDULING AND CONTROL-SYSTEMS IN MANUFACTURING [J].
BONA, B ;
BRANDIMARTE, P ;
GRECO, C ;
MENGA, G .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :673-686
[7]   ORDERING SCHEDULING PROBLEM IN MANUFACTURING SYSTEMS [J].
CONTERNO, R ;
HO, YC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (09) :1487-1510
[8]   THE LAGRANGIAN-RELAXATION METHOD FOR SOLVING INTEGER PROGRAMMING-PROBLEMS [J].
FISHER, ML .
MANAGEMENT SCIENCE, 1981, 27 (01) :1-18
[9]  
FRENCH S, 1982, SEQUENCING SCHEDULIN
[10]   CONTROL PERSPECTIVE ON RECENT TRENDS IN MANUFACTURING SYSTEMS. [J].
Gershwin, Stanley B. ;
Hildebrant, Richard R. ;
Suri, Rajan ;
Mitter, Sanjoy K. .
IEEE Control Systems Magazine, 1986, 6 (02) :3-15